Ergonomics in control centre design for power system

Parmod Kumar, V. Chandna, M.S. Thomas
{"title":"Ergonomics in control centre design for power system","authors":"Parmod Kumar, V. Chandna, M.S. Thomas","doi":"10.1109/POWERI.2006.1632584","DOIUrl":null,"url":null,"abstract":"The control centre in a SCADA set up is the place from where the operator/system engineer monitors the health of the power system and issues necessary control instructions. The operator/system engineer at the control centre undergoes a variety of muscular stresses while working for long durations, which degrades the quality of work. The proper design of the control center will ensure ease of functioning for the operator without experiencing stress in vital body parts. Care should be taken to install the different equipment for monitoring and controlling the power system in suitable atmosphere and housing. Hence, the authors in this paper have given emphasis on the various aspects of the ergonomics in designing the control room and housing rooms in the control centre for the power system","PeriodicalId":191301,"journal":{"name":"2006 IEEE Power India Conference","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Power India Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERI.2006.1632584","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The control centre in a SCADA set up is the place from where the operator/system engineer monitors the health of the power system and issues necessary control instructions. The operator/system engineer at the control centre undergoes a variety of muscular stresses while working for long durations, which degrades the quality of work. The proper design of the control center will ensure ease of functioning for the operator without experiencing stress in vital body parts. Care should be taken to install the different equipment for monitoring and controlling the power system in suitable atmosphere and housing. Hence, the authors in this paper have given emphasis on the various aspects of the ergonomics in designing the control room and housing rooms in the control centre for the power system
电力系统控制中心设计中的人机工程学
SCADA设置中的控制中心是操作员/系统工程师监控电力系统健康状况并发布必要控制指令的地方。控制中心的操作员/系统工程师在长时间工作时承受各种肌肉压力,这会降低工作质量。控制中心的适当设计将确保操作人员的操作方便,而不会在重要的身体部位受到压力。应注意在适当的环境和房屋中安装各种监测和控制电力系统的设备。因此,本文重点介绍了电力系统控制中心控制室和机房设计中人机工程学的各个方面
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信