{"title":"Potter Model - A Change Compliant Software Development Lifecycle Model","authors":"V. Mittal, Charu Chopra","doi":"10.1109/ISMS.2011.22","DOIUrl":null,"url":null,"abstract":"A software development life cycle model based on predicting and deciding maximum possible changes which can come in the time line of project completion has been proposed. The model makes it easy for developers to manage the constantly changing requirements and specifications. This model instead of focusing on people and resources focuses on architecture. It is not a replacement for Agile and other iterative models. It is addition of a new perspective of architecture to the existing software development life cycle methodologies.","PeriodicalId":193599,"journal":{"name":"2011 Second International Conference on Intelligent Systems, Modelling and Simulation","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Second International Conference on Intelligent Systems, Modelling and Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISMS.2011.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
A software development life cycle model based on predicting and deciding maximum possible changes which can come in the time line of project completion has been proposed. The model makes it easy for developers to manage the constantly changing requirements and specifications. This model instead of focusing on people and resources focuses on architecture. It is not a replacement for Agile and other iterative models. It is addition of a new perspective of architecture to the existing software development life cycle methodologies.