{"title":"Studying abbreviated vs. full-word identifier names when dealing with faults: an external replication","authors":"Porfirio Tramontana, M. Risi, G. Scanniello","doi":"10.1145/2652524.2652593","DOIUrl":null,"url":null,"abstract":"Context: abbreviated and full-word identifier names in dealing with faults in source code. Goal: investigating whether the use of abbreviated identifier names affects the ability of novice professional software developers in identifying and fixing faults in Java code. Method: external replication. Results: the results of the original experiment (conducted on C code) were confirmed. Conclusions: the difference in using abbreviated and full-word identifiers is not statistically significant with respect to the time to complete a task and the number of faults identified and fixed.","PeriodicalId":124452,"journal":{"name":"International Symposium on Empirical Software Engineering and Measurement","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Empirical Software Engineering and Measurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/2652524.2652593","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
Context: abbreviated and full-word identifier names in dealing with faults in source code. Goal: investigating whether the use of abbreviated identifier names affects the ability of novice professional software developers in identifying and fixing faults in Java code. Method: external replication. Results: the results of the original experiment (conducted on C code) were confirmed. Conclusions: the difference in using abbreviated and full-word identifiers is not statistically significant with respect to the time to complete a task and the number of faults identified and fixed.