{"title":"AEP Misop Event February 23, 2019","authors":"Phillip Lux","doi":"10.1109/cpre48231.2021.9429714","DOIUrl":null,"url":null,"abstract":"• 138 kV Line exit arrester failure event • Five of Seven 138 kV lines outaged • Two 345-138kV Autos outaged • One of Two 138 kV Buses outaged • Five Protection Misoperations Occurred","PeriodicalId":405115,"journal":{"name":"2021 74th Conference for Protective Relay Engineers (CPRE)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 74th Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/cpre48231.2021.9429714","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
• 138 kV Line exit arrester failure event • Five of Seven 138 kV lines outaged • Two 345-138kV Autos outaged • One of Two 138 kV Buses outaged • Five Protection Misoperations Occurred