{"title":"Changing places [power plant upgrade]","authors":"M. Wynd","doi":"10.1049/PE:20070203","DOIUrl":null,"url":null,"abstract":"This paper explains on how the replacement of the step-up grid transformers at Cruachan power station was achieved with the least impact to the supply. The approach taken was to address a safety issue and minimise the impact of the transformer fault on the overall generation production from Cruachan using a sound engineering assessment of the fault and risk of failure through routine monitoring of the fault through dissolved gas analysis. The result has been to leave the power station with a reduced risk of failure in the future given the ability to have one transformer out of service while generating through the other unit.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20070203","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper explains on how the replacement of the step-up grid transformers at Cruachan power station was achieved with the least impact to the supply. The approach taken was to address a safety issue and minimise the impact of the transformer fault on the overall generation production from Cruachan using a sound engineering assessment of the fault and risk of failure through routine monitoring of the fault through dissolved gas analysis. The result has been to leave the power station with a reduced risk of failure in the future given the ability to have one transformer out of service while generating through the other unit.
更换地点[发电厂升级]
本文阐述了如何在对供电影响最小的情况下实现克鲁尚电站升压电网变压器的更换。采用的方法是解决安全问题,并通过通过溶解气体分析对故障进行常规监测,对故障和故障风险进行合理的工程评估,将变压器故障对Cruachan整体发电产量的影响降至最低。其结果是,由于能够在一个变压器停止服务的同时通过另一个机组发电,电站未来发生故障的风险降低了。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信