{"title":"Changing places [power plant upgrade]","authors":"M. Wynd","doi":"10.1049/PE:20070203","DOIUrl":null,"url":null,"abstract":"This paper explains on how the replacement of the step-up grid transformers at Cruachan power station was achieved with the least impact to the supply. The approach taken was to address a safety issue and minimise the impact of the transformer fault on the overall generation production from Cruachan using a sound engineering assessment of the fault and risk of failure through routine monitoring of the fault through dissolved gas analysis. The result has been to leave the power station with a reduced risk of failure in the future given the ability to have one transformer out of service while generating through the other unit.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20070203","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper explains on how the replacement of the step-up grid transformers at Cruachan power station was achieved with the least impact to the supply. The approach taken was to address a safety issue and minimise the impact of the transformer fault on the overall generation production from Cruachan using a sound engineering assessment of the fault and risk of failure through routine monitoring of the fault through dissolved gas analysis. The result has been to leave the power station with a reduced risk of failure in the future given the ability to have one transformer out of service while generating through the other unit.