Scenarios for Evaluating a Semantic Project Management Approach

Birgit Dippelreiter, Michael Pöttler
{"title":"Scenarios for Evaluating a Semantic Project Management Approach","authors":"Birgit Dippelreiter, Michael Pöttler","doi":"10.2478/v10143-011-0009-2","DOIUrl":null,"url":null,"abstract":"Scenarios for Evaluating a Semantic Project Management Approach Knowledge regarding closed projects is not sufficiently reused while planning new projects to improve the quality of project management processes. The reason is that current project management systems mainly support the ongoing project phase and do not explicitly consider the initiating and closing phase of a project management life cycle. By implementing semantic technologies within an existing open source project management system, these weaknesses can be improved. This system incorporates and links historical project knowledge that contributes to a more effective setup of upcoming projects. To design, develop and implement such a system we conducted interviews with IT companies regarding the strengths and weaknesses of the project management systems in use. On the basis of the interviews we identified three scenarios, which deal with the most common problems of project management, such as consistent data storage and how to retrieve information. These scenarios, described in this paper, are used as requirements and to evaluate the designed prototype.","PeriodicalId":211660,"journal":{"name":"Sci. J. Riga Tech. Univ. Ser. Comput. Sci.","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sci. J. Riga Tech. Univ. Ser. Comput. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/v10143-011-0009-2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Scenarios for Evaluating a Semantic Project Management Approach Knowledge regarding closed projects is not sufficiently reused while planning new projects to improve the quality of project management processes. The reason is that current project management systems mainly support the ongoing project phase and do not explicitly consider the initiating and closing phase of a project management life cycle. By implementing semantic technologies within an existing open source project management system, these weaknesses can be improved. This system incorporates and links historical project knowledge that contributes to a more effective setup of upcoming projects. To design, develop and implement such a system we conducted interviews with IT companies regarding the strengths and weaknesses of the project management systems in use. On the basis of the interviews we identified three scenarios, which deal with the most common problems of project management, such as consistent data storage and how to retrieve information. These scenarios, described in this paper, are used as requirements and to evaluate the designed prototype.
评估语义项目管理方法的场景
在计划新项目以提高项目管理过程的质量时,关于封闭项目的知识没有得到充分的重用。原因是当前的项目管理系统主要支持正在进行的项目阶段,而没有明确考虑项目管理生命周期的开始和结束阶段。通过在现有的开源项目管理系统中实现语义技术,可以改进这些弱点。该系统结合并链接了历史项目知识,有助于更有效地设置即将到来的项目。为了设计、开发和实现这样一个系统,我们对IT公司进行了采访,了解正在使用的项目管理系统的优缺点。在访谈的基础上,我们确定了三个场景,它们处理项目管理中最常见的问题,例如一致的数据存储和如何检索信息。本文描述的这些场景被用作需求和评估设计的原型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信