{"title":"DESIGN OF A PERIOD BATCH CONTROL PLANNING SYSTEM FOR CELLULAR MANUFACTURING","authors":"J. Riezebos","doi":"10.1615/faim1999.450","DOIUrl":null,"url":null,"abstract":"Thesis 1 Introduction 2 Relationships between cells 3 Period Batch Control 4 Design factors for basic unicycle PBC systems 5 Models and methods for determining a period length P 6 Modelling the trade-off between N and P 7 Determining a configuration of the PBC system 8 Co- ordination between cells and PBC system design 9 Conclusions and further research Appendices: Short case descriptions","PeriodicalId":127745,"journal":{"name":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding of Flexible Automation and Integrated Manufacturing 1999","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1615/faim1999.450","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
Thesis 1 Introduction 2 Relationships between cells 3 Period Batch Control 4 Design factors for basic unicycle PBC systems 5 Models and methods for determining a period length P 6 Modelling the trade-off between N and P 7 Determining a configuration of the PBC system 8 Co- ordination between cells and PBC system design 9 Conclusions and further research Appendices: Short case descriptions