{"title":"On application of earned value index to software productivity metrics in embedded computer systems","authors":"V. Kadary","doi":"10.1109/CMPEUR.1992.218455","DOIUrl":null,"url":null,"abstract":"The author describes a method for evaluating software productivity in the program development phase. The use of earned value index as the measure of productivity of a software team involves two steps. First, it requires appropriate preparation or revision of the work plan. The second step is the measurement itself, which is carried out either periodically or upon completion of a milestone. The detailed description of the procedures involved in the estimation process, together with practical examples, are given.<<ETX>>","PeriodicalId":390273,"journal":{"name":"CompEuro 1992 Proceedings Computer Systems and Software Engineering","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"CompEuro 1992 Proceedings Computer Systems and Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CMPEUR.1992.218455","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
The author describes a method for evaluating software productivity in the program development phase. The use of earned value index as the measure of productivity of a software team involves two steps. First, it requires appropriate preparation or revision of the work plan. The second step is the measurement itself, which is carried out either periodically or upon completion of a milestone. The detailed description of the procedures involved in the estimation process, together with practical examples, are given.<>