1 X 1000 kVA Transformer Measurement Analysis using Dyn-11 Vector Group and Off Load Tap Changer

S. Budiyanto, L. M. Silalahi, Freddy Artadima Silaban, A. Kurnia, A. D. Rochendi, M. B. Haryono, Mochamad Furqon Ismail
{"title":"1 X 1000 kVA Transformer Measurement Analysis using Dyn-11 Vector Group and Off Load Tap Changer","authors":"S. Budiyanto, L. M. Silalahi, Freddy Artadima Silaban, A. Kurnia, A. D. Rochendi, M. B. Haryono, Mochamad Furqon Ismail","doi":"10.51662/jiae.v1i2.14","DOIUrl":null,"url":null,"abstract":"The transmission line of electrical energy generated by the power plant is usually located far from the load center to be distributed to the community. The substation is part of a distribution transmission line that acts as a control center and consists of a collection of extra high voltage equipment. Routine maintenance of the power transformer as the main equipment of the substation must be scheduled so that its performance remains reliable. The proposed method of this research is to analyze the condition of the transformer through testing when it is off, to the calculation of the transformer ratio to determine the condition of the transformer windings using the calculation of the formula and measurement of the Raytech Transformer Turn Ration measuring instrument. In this research, the Raytech Transformer Turn Ratio measurement tool is used to determine the ratio of the winding input voltage of 20,000 volts and the output voltage of 400 volts on the power transformer. At a voltage of 40VAC, from the results of the comparisons that have been made, it can be seen that the test results of the Raytech Transformer Turn Ratio measuring instrument, if it crosses the 0.5% tolerance limit, the measurement results on one of the coils change the ratio. If the transformer is not regularly checked, the impact will result in unbalance of voltage on one of the coils. And one of the coils in phase will expand and cause a loss of voltage.","PeriodicalId":424190,"journal":{"name":"Journal of Integrated and Advanced Engineering (JIAE)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Integrated and Advanced Engineering (JIAE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51662/jiae.v1i2.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The transmission line of electrical energy generated by the power plant is usually located far from the load center to be distributed to the community. The substation is part of a distribution transmission line that acts as a control center and consists of a collection of extra high voltage equipment. Routine maintenance of the power transformer as the main equipment of the substation must be scheduled so that its performance remains reliable. The proposed method of this research is to analyze the condition of the transformer through testing when it is off, to the calculation of the transformer ratio to determine the condition of the transformer windings using the calculation of the formula and measurement of the Raytech Transformer Turn Ration measuring instrument. In this research, the Raytech Transformer Turn Ratio measurement tool is used to determine the ratio of the winding input voltage of 20,000 volts and the output voltage of 400 volts on the power transformer. At a voltage of 40VAC, from the results of the comparisons that have been made, it can be seen that the test results of the Raytech Transformer Turn Ratio measuring instrument, if it crosses the 0.5% tolerance limit, the measurement results on one of the coils change the ratio. If the transformer is not regularly checked, the impact will result in unbalance of voltage on one of the coils. And one of the coils in phase will expand and cause a loss of voltage.
使用Dyn-11矢量组和无载分接开关的1 × 1000kva变压器测量分析
发电厂产生的电能的传输线通常位于远离负荷中心的地方,向社区输送。变电站是配电线路的一部分,作为控制中心,由一系列超高压设备组成。电力变压器作为变电站的主要设备,必须对其进行定期维护,使其性能保持可靠。本研究提出的方法是通过对变压器断开时的测试来分析变压器的状态,对变压器的变比进行计算,利用Raytech变压器匝比测量仪的公式计算和测量来确定变压器绕组的状态。在本研究中,使用Raytech变压器匝比测量工具来确定电力变压器绕组输入电压为20,000伏与输出电压为400伏的比值。在40VAC的电压下,从所做的比较结果可以看出,Raytech变压器匝比测量仪的测试结果,如果它超过0.5%的公差限制,其中一个线圈上的测量结果会改变匝比。如果不定期检查变压器,冲击将导致其中一个线圈上的电压不平衡。其中一个同相的线圈会膨胀,导致电压损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信