Photographic Record and Time Delays

R. P. Maher
{"title":"Photographic Record and Time Delays","authors":"R. P. Maher","doi":"10.1061/JCCEAZ.0000901","DOIUrl":null,"url":null,"abstract":"This paper is presented for suggesting the use of photography to gather valid information about time delays on a construction project, which always cause major expense in themselves, and if they are taken to litigation, even greater expense. One very expensive feature of this item is gathering of evidence to prove causes, extent, and result of delays. For gathering evidence which is accurate and true in its form, and which can be accomplished at a faster and more economical rate, the writer suggests photographic record be used. The use of record as an accepted industry practice and as a legally acceptable documentation tool needs to be justified as to cost.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1980-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000901","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper is presented for suggesting the use of photography to gather valid information about time delays on a construction project, which always cause major expense in themselves, and if they are taken to litigation, even greater expense. One very expensive feature of this item is gathering of evidence to prove causes, extent, and result of delays. For gathering evidence which is accurate and true in its form, and which can be accomplished at a faster and more economical rate, the writer suggests photographic record be used. The use of record as an accepted industry practice and as a legally acceptable documentation tool needs to be justified as to cost.
摄影记录和时间延迟
这篇论文是为了建议使用摄影来收集有关建设项目的时间延误的有效信息,这总是会造成重大的损失,如果他们被起诉,甚至更大的损失。这项工作的一个非常昂贵的特点是收集证据来证明延误的原因、程度和结果。为了收集证据的形式既准确又真实,而且能以更快更经济的速度完成,作者建议采用摄影记录的方法。将记录作为可接受的行业实践和法律上可接受的文件工具需要在成本方面证明是合理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信