{"title":"Turn-Key Project During the Construction of the Telecommunication System in the Five New States of the Frg","authors":"W. Rath","doi":"10.1109/TELESC.1994.4794345","DOIUrl":null,"url":null,"abstract":"The political and economic reunification of Germnany in 1990 created a problem for the Deutsche Bundespost Telekom (Telekom). namely to update the totally uinsatisfactory, telecommuinication infrastructure of the new, federal states in the shortest possible time. The greatest challenge was the time factor in other words, the prov,ision of a comprehensive telecommunication system as quick]), as possible. There were two reasons why this was particularly imiportant: 1. The telecommiunication network in the newN states had to be technically as good as, or better than, that in the west. so that enitreprenieurs would not be deterred fromi invlesting. 2. For decades.. the people i-n the niewN states had miade do either with miultiple or party lines, or wvith no telephone at all. For political reasons, therefore, it was felt that the timec had come to bring them up to the level of their nieighibours in the west.","PeriodicalId":178715,"journal":{"name":"TELESCON '94 - The First International Telecommunications Energy Special Conference","volume":"368 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"TELESCON '94 - The First International Telecommunications Energy Special Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TELESC.1994.4794345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The political and economic reunification of Germnany in 1990 created a problem for the Deutsche Bundespost Telekom (Telekom). namely to update the totally uinsatisfactory, telecommuinication infrastructure of the new, federal states in the shortest possible time. The greatest challenge was the time factor in other words, the prov,ision of a comprehensive telecommunication system as quick]), as possible. There were two reasons why this was particularly imiportant: 1. The telecommiunication network in the newN states had to be technically as good as, or better than, that in the west. so that enitreprenieurs would not be deterred fromi invlesting. 2. For decades.. the people i-n the niewN states had miade do either with miultiple or party lines, or wvith no telephone at all. For political reasons, therefore, it was felt that the timec had come to bring them up to the level of their nieighibours in the west.
新五州电信系统建设中的交钥匙工程
1990年德国的政治和经济统一给德国联邦邮政电信(Deutsche Bundespost Telekom)带来了一个问题。即在尽可能短的时间内更新新联邦州完全不令人满意的电信基础设施。最大的挑战是时间因素,换句话说,就是尽可能快地提供一个全面的电信系统。这一点之所以特别重要,有两个原因:新兴国家的电信网络在技术上必须与西方一样好,甚至更好。这样企业家们就不会因为投资而却步。2. 几十年来,. .在新成立的州,人们要么使用多线路或政党线路,要么根本没有电话。因此,出于政治原因,人们认为是时候把它们提高到西方邻国的水平了。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信