CULVERT DESIGN ANALYSIS USING HY-8 SOFTWARE TO DRAIN SURFACE RUNOFF DISCHARGE AT CV GUNUNG BATUJAJAR, WEST BANDUNG REGENCY, WEST JAVA, INDONESIA

A. Christian, Heri Prasetya
{"title":"CULVERT DESIGN ANALYSIS USING HY-8 SOFTWARE TO DRAIN SURFACE RUNOFF DISCHARGE AT CV GUNUNG BATUJAJAR, WEST BANDUNG REGENCY, WEST JAVA, INDONESIA","authors":"A. Christian, Heri Prasetya","doi":"10.15408/jipl.v2i1.25829","DOIUrl":null,"url":null,"abstract":"CV Gunung Batujajar is a company engaged in the mining of industrial minerals in the form of andesite that applies an open-pit mining system (surface mining). Regarding the mining drainage system that is applied, there are still obstacles in dealing with drainage problems. The flow of rainwater in CV Gunung Batujajar generally flows in two places, to the large opening pit in the south with a percentage of 70% water flow and to the north by 30%. After further review, 30% of the water flow turned out to be flowing towards residents' housing and causing the water to overflow until it was flooded, thus disrupting the productivity of the population. Therefore, the authors conducted research related to the analysis of the drainage system using a culvert. In conducting the research, the authors took several types of data such as rainfall data for 10 years, field data on road geometry conditions, etc. With a planned rainfall value of 157.06 mm/day and a planned rainfall intensity of 54.45 mm/hour obtained the design runoff discharge is 0.35 m3/s. For the culvert design at the first outlet, a trapezoidal shape design is used with a base length of 0.225 m and a height of 0.2 m. As for the design at the second outlet, it is in the form of a trapezoid with a base length of 1.2 m and a height of 1.3 m. The second outlet is concluded to be more technically secure.","PeriodicalId":377156,"journal":{"name":"Jurnal Inovasi Pertambangan dan Lingkungan","volume":"184 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Inovasi Pertambangan dan Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15408/jipl.v2i1.25829","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

CV Gunung Batujajar is a company engaged in the mining of industrial minerals in the form of andesite that applies an open-pit mining system (surface mining). Regarding the mining drainage system that is applied, there are still obstacles in dealing with drainage problems. The flow of rainwater in CV Gunung Batujajar generally flows in two places, to the large opening pit in the south with a percentage of 70% water flow and to the north by 30%. After further review, 30% of the water flow turned out to be flowing towards residents' housing and causing the water to overflow until it was flooded, thus disrupting the productivity of the population. Therefore, the authors conducted research related to the analysis of the drainage system using a culvert. In conducting the research, the authors took several types of data such as rainfall data for 10 years, field data on road geometry conditions, etc. With a planned rainfall value of 157.06 mm/day and a planned rainfall intensity of 54.45 mm/hour obtained the design runoff discharge is 0.35 m3/s. For the culvert design at the first outlet, a trapezoidal shape design is used with a base length of 0.225 m and a height of 0.2 m. As for the design at the second outlet, it is in the form of a trapezoid with a base length of 1.2 m and a height of 1.3 m. The second outlet is concluded to be more technically secure.
利用hy-8软件对印尼西爪哇西万隆县CV gunung batujajar地表水排放进行涵洞设计分析
CV Gunung Batujajar是一家从事安山岩形式的工业矿物开采的公司,采用露天采矿系统(露天采矿)。对于目前应用的矿山排水系统,在处理排水问题上仍存在障碍。CV Gunung Batujajar的雨水一般流向两个地方,南部的大露天坑占70%的流量,北部占30%的流量。经过进一步的审查,30%的水流流向了居民的住房,导致水溢出直到被淹没,从而破坏了人口的生产力。因此,笔者对采用涵洞的排水系统进行了相关的分析研究。在进行研究时,作者采用了几种类型的数据,如10年的降雨量数据,道路几何条件的实地数据等。规划降雨量为157.06 mm/d,规划降雨强度为54.45 mm/h,设计径流量为0.35 m3/s。第一出水口涵洞设计采用梯形设计,基长0.225 m,高0.2 m。第二出口设计为梯形形式,底长1.2 m,高1.3 m。第二个出口被认为在技术上更安全。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信