{"title":"An Effective Means of Tracking Temporary Safety Grounds","authors":"G. Drewiske","doi":"10.1109/esw49146.2022.9925025","DOIUrl":null,"url":null,"abstract":"Recent editions of NFPA 70E require risk assessments to address the potential for human error. This case study will detail how a simple, two-part tagging process to track temporary safety ground sets prevented a tired group of maintenance personnel from energizing into a temporary ground set on the last night of a twelve day utility outage.","PeriodicalId":325388,"journal":{"name":"2022 IEEE IAS Electrical Safety Workshop (ESW)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE IAS Electrical Safety Workshop (ESW)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/esw49146.2022.9925025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Recent editions of NFPA 70E require risk assessments to address the potential for human error. This case study will detail how a simple, two-part tagging process to track temporary safety ground sets prevented a tired group of maintenance personnel from energizing into a temporary ground set on the last night of a twelve day utility outage.