Association of Number of Bidders and Minimum Bid Ratio (AEr) with Effect of E-bidding of Different Project

Anjay Kumar Mishra, Megh Bahadur K. C., P. Aithal
{"title":"Association of Number of Bidders and Minimum Bid Ratio (AEr) with Effect of E-bidding of Different Project","authors":"Anjay Kumar Mishra, Megh Bahadur K. C., P. Aithal","doi":"10.2139/ssrn.3724112","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to analyze the relation between the number of bidders versus the minimum bid ratio (AEr)/percentage below the initial engineer’s estimate to type and size of project within Road Divisions Butwal and Shivapur. Bidding data of four consecutive fiscal years starting from 072/73 of two Road Divisions which are already completed its procurement stage were analyzed. The percentage below/contract awarded cost is directly proportional or a significant correlation was found with the number of the participated bidder in any project s of both divisions during the data study period. Bidders have to bid below 20% of the initial estimate that was found to get a project in hand by contractors and they are willing to bid low for the utilization of resources, types of equipment, manpower, and also to get experiences. This research revealed correlation coefficients between the number of bidders and percentage below engineers' estimates are 0.61 for the Butwal division and 0.67 for the Shivapur division. Correlation coefficients 0.82 and 0.83 was found in Nepalgunj and Mahendranagar. Percentage below engineers' estimate depends on 67 and 69% on the number of bidders in Nepalgunj and Mahendranagar respectively. E-bidding helped to promote competition along with low bidding. As there is 17% below with only hardcopy bidding but with e-bid the below percentages rises to 28% with more number of bidder per project. Improvement in existing offer granting framework with additional capability rules ought to be engaged by doling out the weight in the monitory term, soliciting a technique from the proclamation, upgraded e-offering framework, and affirmation for venture exhibitions of the undertaking before execution. This research would be useful for those who are involving in policy making and governing agencies like Public Procurement Monitoring Office and for making necessary amendments in existing rules.","PeriodicalId":430354,"journal":{"name":"IO: Empirical Studies of Firms & Markets eJournal","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IO: Empirical Studies of Firms & Markets eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3724112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The purpose of this research is to analyze the relation between the number of bidders versus the minimum bid ratio (AEr)/percentage below the initial engineer’s estimate to type and size of project within Road Divisions Butwal and Shivapur. Bidding data of four consecutive fiscal years starting from 072/73 of two Road Divisions which are already completed its procurement stage were analyzed. The percentage below/contract awarded cost is directly proportional or a significant correlation was found with the number of the participated bidder in any project s of both divisions during the data study period. Bidders have to bid below 20% of the initial estimate that was found to get a project in hand by contractors and they are willing to bid low for the utilization of resources, types of equipment, manpower, and also to get experiences. This research revealed correlation coefficients between the number of bidders and percentage below engineers' estimates are 0.61 for the Butwal division and 0.67 for the Shivapur division. Correlation coefficients 0.82 and 0.83 was found in Nepalgunj and Mahendranagar. Percentage below engineers' estimate depends on 67 and 69% on the number of bidders in Nepalgunj and Mahendranagar respectively. E-bidding helped to promote competition along with low bidding. As there is 17% below with only hardcopy bidding but with e-bid the below percentages rises to 28% with more number of bidder per project. Improvement in existing offer granting framework with additional capability rules ought to be engaged by doling out the weight in the monitory term, soliciting a technique from the proclamation, upgraded e-offering framework, and affirmation for venture exhibitions of the undertaking before execution. This research would be useful for those who are involving in policy making and governing agencies like Public Procurement Monitoring Office and for making necessary amendments in existing rules.
投标人数量和最低投标比(AEr)与不同项目电子投标效果的关系
本研究的目的是分析投标人数量与最低投标比例(AEr)/低于初始工程师对道路分部Butwal和Shivapur项目类型和规模的估计百分比之间的关系。分析了已完成采购阶段的两个公路事业部从072/73开始连续四个会计年度的招标数据。在数据研究期间,低于/合同授予成本的百分比与两个部门的任何项目的参与投标人数量成正比或显着相关。投标人必须出价低于承包商发现的项目初始估价的20%,并且他们愿意为资源,设备类型,人力的利用以及获得经验而出价低。该研究显示,Butwal分部的投标数量与低于工程师估计的百分比之间的相关系数为0.61,Shivapur分部的相关系数为0.67。尼泊尔君和马亨德拉讷格的相关系数分别为0.82和0.83。低于工程师估计的百分比分别取决于尼泊尔和Mahendranagar的投标人数量的67%和69%。电子招标有助于促进竞争和低出价。由于只有硬拷贝投标的17%以下,但通过电子投标,以下百分比上升到28%,每个项目的投标人数量更多。对现有的要约授予框架进行改进,增加能力规则,可以通过在监测期限内分配权重,从公告中征求技术,升级电子要约框架,并在执行前确认企业的风险展示。这项研究对那些参与政策制定和公共采购监测办公室等管理机构的人以及对现有规则进行必要修订的人很有用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信