{"title":"Performance Evaluation of 25 KW Community Microhydro in Seloliman Village East Java","authors":"Haksari Laksmi Bestari, I. Kumara, W. G. Ariastina","doi":"10.1109/ICSGTEIS.2018.8709110","DOIUrl":null,"url":null,"abstract":"Indonesia has abundance potential of water resource for generating electric power. It was estimated that 19,385 MW power could be harnessed using mini or micro hydropower technology (MHPP). Most of the unelectrified areas of Indonesia was due to the problem associated with large investments of distribution networks to reach those areas and low energy sales. The small-scale hydropower was an effective solution to supply electricity in those areas. Indonesia has built many MHPP, but many suffer from both technical and sustainable issues. Seloliman MHPP in one of the community-based power plant which has been operating since 1994. This research attempt to assess the performance of the plant seen from its capacity factors, power quality, and reliability. The research methods used include site observation, interview with plant’s operators, energy production and sale, and documents reviews. The result showed that energy production of MHPP Seloliman from 2013 till 2017 was 808 MWh with total operating hours of 43,374 or around 161.6 MWh per year. Consequently, it reached an annual average capacity factor of 58% which indicate the power plant was very productive. The power quality of the plant was relatively good with voltage level was stable at 220 V and frequency at 50 Hz. The plant also supplied the consumer with good reliability seen from the total operating hours of the plant and also views of the plant’s operator. Overall, Seloliman MHPP is one good example of microhydro implementation in Indonesia.","PeriodicalId":438615,"journal":{"name":"2018 International Conference on Smart Green Technology in Electrical and Information Systems (ICSGTEIS)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on Smart Green Technology in Electrical and Information Systems (ICSGTEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSGTEIS.2018.8709110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Indonesia has abundance potential of water resource for generating electric power. It was estimated that 19,385 MW power could be harnessed using mini or micro hydropower technology (MHPP). Most of the unelectrified areas of Indonesia was due to the problem associated with large investments of distribution networks to reach those areas and low energy sales. The small-scale hydropower was an effective solution to supply electricity in those areas. Indonesia has built many MHPP, but many suffer from both technical and sustainable issues. Seloliman MHPP in one of the community-based power plant which has been operating since 1994. This research attempt to assess the performance of the plant seen from its capacity factors, power quality, and reliability. The research methods used include site observation, interview with plant’s operators, energy production and sale, and documents reviews. The result showed that energy production of MHPP Seloliman from 2013 till 2017 was 808 MWh with total operating hours of 43,374 or around 161.6 MWh per year. Consequently, it reached an annual average capacity factor of 58% which indicate the power plant was very productive. The power quality of the plant was relatively good with voltage level was stable at 220 V and frequency at 50 Hz. The plant also supplied the consumer with good reliability seen from the total operating hours of the plant and also views of the plant’s operator. Overall, Seloliman MHPP is one good example of microhydro implementation in Indonesia.
东爪哇Seloliman村25千瓦社区微水电性能评价
印度尼西亚拥有丰富的水力发电潜力。据估计,使用微型或微型水电技术(MHPP)可以利用19385兆瓦的电力。印度尼西亚大多数未通电地区的原因是,为到达这些地区而对配电网络进行了大量投资,而能源销售较低。小型水电是解决这些地区电力供应问题的有效途径。印度尼西亚已经建造了许多MHPP,但许多都受到技术和可持续问题的困扰。Seloliman MHPP是一个社区发电厂,自1994年以来一直在运行。本研究试图从容量因素、电能质量和可靠性三个方面来评估电厂的性能。研究方法包括现场观察、与电厂经营者面谈、能源生产与销售、文献查阅等。结果表明,从2013年到2017年,MHPP Seloliman的发电量为808兆瓦时,总运行时间为43,374小时,每年约为161.6兆瓦时。因此,它达到了58%的年平均容量系数,这表明发电厂是非常富有成效的。电站电能质量较好,电压水平稳定在220v,频率稳定在50hz。从工厂的总运行时间和工厂操作员的观点来看,该工厂还为消费者提供了良好的可靠性。总的来说,Seloliman MHPP是印度尼西亚实施微型水电的一个很好的例子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信