{"title":"Design and application of a calibrator suitable for direct current transformer of Zhangbei VSC-HVDC Project","authors":"Zhang Shuo, Gao Shuai, Zhao Lin, Xu Zhanhe, Nie Qi, Huang Junchang","doi":"10.1109/CICED50259.2021.9556743","DOIUrl":null,"url":null,"abstract":"DC transformer is the core equipment to provide control, protection and measurement signal in DC transmission project, its reliable work directly affects the safety and stability of the system. In order to develop a calibrator for DC transformer of Zhangbei VSC-HVDC Project, this paper studies a precise synchronous verification scheme and a high-speed FT3 message reception and analysis scheme through the analysis of non synchronous verification and secondary signal processing, which meets the needs of FT3 message analysis under different sampling rates during field verification of transformer, and is suitable for Zhangbei VSC-HVDC Project equipment In this paper, the hardware and software structure of the calibrator system are also studied, and the error calibration test of the calibrator is carried out. Finally, the calibrator is applied in a converter station of Zhangbei VSC-HVDC Project.","PeriodicalId":221387,"journal":{"name":"2021 China International Conference on Electricity Distribution (CICED)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED50259.2021.9556743","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

DC transformer is the core equipment to provide control, protection and measurement signal in DC transmission project, its reliable work directly affects the safety and stability of the system. In order to develop a calibrator for DC transformer of Zhangbei VSC-HVDC Project, this paper studies a precise synchronous verification scheme and a high-speed FT3 message reception and analysis scheme through the analysis of non synchronous verification and secondary signal processing, which meets the needs of FT3 message analysis under different sampling rates during field verification of transformer, and is suitable for Zhangbei VSC-HVDC Project equipment In this paper, the hardware and software structure of the calibrator system are also studied, and the error calibration test of the calibrator is carried out. Finally, the calibrator is applied in a converter station of Zhangbei VSC-HVDC Project.
张北直流直流工程直流互感器校准器的设计与应用
直流变压器是直流输电工程中提供控制、保护和测量信号的核心设备,其工作的可靠性直接影响到系统的安全稳定。为了研制张北vdc - hvdc工程直流变压器校验仪,本文通过对非同步校验和二次信号处理的分析,研究了精确同步校验方案和高速FT3报文接收与分析方案,满足变压器现场校验中不同采样率下FT3报文分析的需要,适用于张北vdc - hvdc工程设备。研究了校准器系统的硬件和软件结构,并对校准器进行了误差校准试验。最后,将该校准器应用于张北直流换流站工程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信