First results on bistatic MTI activity at fraunhofer FHR

D. Cristallini
{"title":"First results on bistatic MTI activity at fraunhofer FHR","authors":"D. Cristallini","doi":"10.1109/RADAR.2013.6652034","DOIUrl":null,"url":null,"abstract":"In this paper the preliminary results on bistatic MTI activities conducted at Fraunhofer FHR are presented. In particular, the bistatic experiment conducted in November 2010 is described which involved the use of a stationary transmitter and of the multi-channel system PAMIR [1] mounted on the Transall aircraft acting as moving receiver. Main challenges of the considered bistatic configuration such as local oscillators drift and clutter non-homogeneities are addressed. MTI results are presented both concerning cooperative and synthetic injected targets.","PeriodicalId":365285,"journal":{"name":"2013 International Conference on Radar","volume":"572 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 International Conference on Radar","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RADAR.2013.6652034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

In this paper the preliminary results on bistatic MTI activities conducted at Fraunhofer FHR are presented. In particular, the bistatic experiment conducted in November 2010 is described which involved the use of a stationary transmitter and of the multi-channel system PAMIR [1] mounted on the Transall aircraft acting as moving receiver. Main challenges of the considered bistatic configuration such as local oscillators drift and clutter non-homogeneities are addressed. MTI results are presented both concerning cooperative and synthetic injected targets.
弗劳恩霍夫FHR双稳态MTI活性的初步结果
本文介绍了在弗劳恩霍夫FHR进行的双稳态MTI活动的初步结果。特别是,2010年11月进行的双基地实验,涉及使用固定发射机和安装在Transall飞机上的多通道系统PAMIR[1]作为移动接收器。解决了双基地结构的主要挑战,如本振漂移和杂波非均匀性。给出了协同注入靶和合成注入靶的MTI结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信