{"title":"Availability-based path selection","authors":"Song Yang, S. Trajanovski, F. Kuipers","doi":"10.1109/RNDM.2014.7014929","DOIUrl":null,"url":null,"abstract":"In data communication networks, connection availability, which is defined as the probability that the corresponding connection will be found in the operating state, is a key element of many Service Level Agreements (SLA). The path over which a connection is to be established should obey the agreed-upon availability, otherwise the service provider may face revenue loss as stipulated in the SLA. In this paper, we study the problem of establishing a connection over at most k (partially) link-disjoint paths for which the availability is no less than δ (0 <; δ ≤ 1). We consider networks with and without Shared-Risk Link Groups (SRLGs). We prove that this problem, in general, cannot be approximated in polynomial time, unless P=NP. We subsequently propose a polynomial-time heuristic algorithm and an exact Integer Nonlinear Programming (INLP) formulation for availability-based path selection. Finally, the proposed algorithms and two existing heuristic algorithms are compared in terms of acceptance ratio and running time.","PeriodicalId":299072,"journal":{"name":"2014 6th International Workshop on Reliable Networks Design and Modeling (RNDM)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 6th International Workshop on Reliable Networks Design and Modeling (RNDM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RNDM.2014.7014929","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
In data communication networks, connection availability, which is defined as the probability that the corresponding connection will be found in the operating state, is a key element of many Service Level Agreements (SLA). The path over which a connection is to be established should obey the agreed-upon availability, otherwise the service provider may face revenue loss as stipulated in the SLA. In this paper, we study the problem of establishing a connection over at most k (partially) link-disjoint paths for which the availability is no less than δ (0 <; δ ≤ 1). We consider networks with and without Shared-Risk Link Groups (SRLGs). We prove that this problem, in general, cannot be approximated in polynomial time, unless P=NP. We subsequently propose a polynomial-time heuristic algorithm and an exact Integer Nonlinear Programming (INLP) formulation for availability-based path selection. Finally, the proposed algorithms and two existing heuristic algorithms are compared in terms of acceptance ratio and running time.