{"title":"Automation experiences on a new 1 micron production fab","authors":"F.M.T. Chi, M. Cornelison, M. Brain, M. Schewe","doi":"10.1109/ISMSS.1991.146273","DOIUrl":null,"url":null,"abstract":"The authors describe an operational automation system that addresses the need for more consistent, repeatable process execution without mistakes. This system manages and controls material flow throughout the semiconductor ASIC (application-specific integrated circuit) manufacturing process. The authors describe the system implementation experience and the lessons learned. Issues of process 'step/equipment validation', work in process, storage management, material transport, and CIM (computer-integrated manufacturing) system integration are discussed. Experience in a high-volume production environment is described.<<ETX>>","PeriodicalId":440790,"journal":{"name":"1991 Proceedings IEEE/SEMI International Semiconductor Manufacturing Science Symposium","volume":"222 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1991 Proceedings IEEE/SEMI International Semiconductor Manufacturing Science Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISMSS.1991.146273","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The authors describe an operational automation system that addresses the need for more consistent, repeatable process execution without mistakes. This system manages and controls material flow throughout the semiconductor ASIC (application-specific integrated circuit) manufacturing process. The authors describe the system implementation experience and the lessons learned. Issues of process 'step/equipment validation', work in process, storage management, material transport, and CIM (computer-integrated manufacturing) system integration are discussed. Experience in a high-volume production environment is described.<>