PERENCANAAN PONDASI TIANG PANCANG GEDUNG KETAHANAN PANGAN NGANJUK

Bagus Anggoro Wiratmoko, Sigit Winarto, Yosef Cahyo
{"title":"PERENCANAAN PONDASI TIANG PANCANG GEDUNG KETAHANAN PANGAN NGANJUK","authors":"Bagus Anggoro Wiratmoko, Sigit Winarto, Yosef Cahyo","doi":"10.30737/JURMATEKS.V2I1.396","DOIUrl":null,"url":null,"abstract":"This study uses library research methods. sources used in planning in the form of primary data and secondary data. Where the data includes soil data, pile data, and load data. The theoretical basis used is a static theoretical basis according to Luciano Decourt based on SPT data using manual method calculations. From the results of the calculation it can be concluded that the results of loading on the 1st floor to 4th floor are 6218.6 tons. Dimesnsi and suitable pile foundation depth are: Type1 foundation: 3.6 m long, 3.6 m wide, 0.8 m high and 1 m deep. Type2 foundation: 3.6 m long, 5.4 m wide, 0.8 m high and 1 m deep. The importance of foundation reinforcement is 70089.8 kg. Stability of control: - Against rolling = 24,620 t / m2> 1.5 t / m2 -> Safe - Against shear = 9,156 t / m2> 1.5 t / m2 -> SafePenelitian ini menggunakan metode penelitian pustaka. sumber yang digunakan dalam perencanaan berupa data primer dan data sekunder. Dimana data tersebut meliputi data tanah, data tiang pancang, dan data beban. Landasan teori yang digunakan adalah landasan teori statis menurut Luciano Decourt berdasarkan data SPT dengan menggunakan metode perhitungan manual. Dari hasil perhitungan dapat disimpulkan bahwa hasil pembebanan pada lantai 1 sampai lantai 4 sebesar 6.218,6 ton. Dimesnsi dan kedalaman pondasi tiang yang sesuai adalah: Pondasi tipe1: panjang 3,6 m, lebar 3,6 m, tinggi 0,8 m, dan dalam 1 m. Pondasi tipe 2: panjang 3,6 m, lebar 5,4 m, tinggi 0,8 m, dan dalam 1 m. Pentingnya perkuatan pondasi adalah 70089,8 kg. Kestabilan pengendalian: - Melawan rolling = 24.620 t / m2> 1,5 t / m2 -> Aman - Terhadap geser = 9,156 t / m2> 1,5 t / m2 -> Aman","PeriodicalId":382880,"journal":{"name":"Jurnal Manajemen Teknologi & Teknik Sipil","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Manajemen Teknologi & Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30737/JURMATEKS.V2I1.396","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This study uses library research methods. sources used in planning in the form of primary data and secondary data. Where the data includes soil data, pile data, and load data. The theoretical basis used is a static theoretical basis according to Luciano Decourt based on SPT data using manual method calculations. From the results of the calculation it can be concluded that the results of loading on the 1st floor to 4th floor are 6218.6 tons. Dimesnsi and suitable pile foundation depth are: Type1 foundation: 3.6 m long, 3.6 m wide, 0.8 m high and 1 m deep. Type2 foundation: 3.6 m long, 5.4 m wide, 0.8 m high and 1 m deep. The importance of foundation reinforcement is 70089.8 kg. Stability of control: - Against rolling = 24,620 t / m2> 1.5 t / m2 -> Safe - Against shear = 9,156 t / m2> 1.5 t / m2 -> SafePenelitian ini menggunakan metode penelitian pustaka. sumber yang digunakan dalam perencanaan berupa data primer dan data sekunder. Dimana data tersebut meliputi data tanah, data tiang pancang, dan data beban. Landasan teori yang digunakan adalah landasan teori statis menurut Luciano Decourt berdasarkan data SPT dengan menggunakan metode perhitungan manual. Dari hasil perhitungan dapat disimpulkan bahwa hasil pembebanan pada lantai 1 sampai lantai 4 sebesar 6.218,6 ton. Dimesnsi dan kedalaman pondasi tiang yang sesuai adalah: Pondasi tipe1: panjang 3,6 m, lebar 3,6 m, tinggi 0,8 m, dan dalam 1 m. Pondasi tipe 2: panjang 3,6 m, lebar 5,4 m, tinggi 0,8 m, dan dalam 1 m. Pentingnya perkuatan pondasi adalah 70089,8 kg. Kestabilan pengendalian: - Melawan rolling = 24.620 t / m2> 1,5 t / m2 -> Aman - Terhadap geser = 9,156 t / m2> 1,5 t / m2 -> Aman
规划食品安全大楼的基础设施
本研究采用图书馆研究方法。计划中使用的原始数据和辅助数据形式的来源。其中数据包括土数据、桩数据和荷载数据。所使用的理论基础是Luciano Decourt根据SPT数据采用手工方法计算的静态理论基础。由计算结果可知,1层至4层的荷载结果为6218.6吨。1型基础:长3.6 m,宽3.6 m,高0.8 m,深1 m。2型基础:长3.6 m,宽5.4 m,高0.8 m,深1 m。基础加固重要性70089.8 kg。控制稳定性:-抗滚动= 24,620 t / m2> 1.5 t / m2 ->安全-抗剪切= 9,156 t / m2> 1.5 t / m2 -> SafePenelitian ini menggunakan mede penelitian pustaka。Sumber Yang digunakan dalam perencananberupa data primer Dan data sekunder。数据精简,数据精简,数据精简,数据精简。Landasan teori yang digunakan adalah Landasan teori statis menurut Luciano Decourt berdasarkan数据SPT dengan menggunakan方法perhitungan手册。Dari hasil perhitungan dapat dispulkan bahwa hasil ppenbanan padlantai 1 sampai lantai 4 sebesar 6.218,6吨。丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹,丹丹丹庞达西类型2:盘江3、6米,利巴5、4米,亭吉0、8米,丹达兰1米。彭定宁-白瓜-庞达斯-阿达拉70089,8公斤。Kestabilan pengendalian: - Melawan轧制= 24.620 t / m2> 1,5 t / m2 -> Aman - Terhadap geser = 9,156 t / m2> 1,5 t / m2 -> Aman
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书