Risk-based planner for asset management [of electric utilities]

G. Anders, J. Endrenyi, C. Yung
{"title":"Risk-based planner for asset management [of electric utilities]","authors":"G. Anders, J. Endrenyi, C. Yung","doi":"10.1109/67.954523","DOIUrl":null,"url":null,"abstract":"Faced with multiple options for reinvestment in equipment maintenance, what is the best course of action to maximize reliability at minimum cost? The combination of engineering and financial analyses requires complex mathematical modeling; however, the software must be user-friendly to make the operation of the model simple. With this in mind, substantial effort has been put in developing a suitable decision-support tool to address the question of option selection. This article features the program called Risk-Based Asset Management (RiBAM) and its application in the reinvestment decision-making process.","PeriodicalId":435675,"journal":{"name":"IEEE Computer Applications in Power","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"50","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Computer Applications in Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/67.954523","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 50

Abstract

Faced with multiple options for reinvestment in equipment maintenance, what is the best course of action to maximize reliability at minimum cost? The combination of engineering and financial analyses requires complex mathematical modeling; however, the software must be user-friendly to make the operation of the model simple. With this in mind, substantial effort has been put in developing a suitable decision-support tool to address the question of option selection. This article features the program called Risk-Based Asset Management (RiBAM) and its application in the reinvestment decision-making process.
基于风险的资产管理计划者[电力公司]
面对设备维护再投资的多种选择,以最小成本最大化可靠性的最佳方案是什么?工程和财务分析的结合需要复杂的数学建模;然而,软件必须是用户友好的,使模型的操作简单。考虑到这一点,已经投入了大量的努力来开发一个合适的决策支持工具来解决期权选择问题。本文介绍了基于风险的资产管理(RiBAM)程序及其在再投资决策过程中的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信