{"title":"Successful Application of Fishable and Sectional ESS Completion Technology for Sand Control _ A Case History in SHAD Field","authors":"Lina Zhang, Heng Zhang, Jintong Hu, Songjie Zhang, Wenling Yang, Changlu Yang, Xueliang Yu, Yuhong Hao, Bin Wang","doi":"10.2118/209868-ms","DOIUrl":null,"url":null,"abstract":"\n SHAD oilfield, located in one of the fields with the highest onshore production in the Middle East; more than 70% of its production wells are flowing wells, with an average single well production capacity of more than 3000 bbl/d. Its main oil production formation is loose sandstone reservoir. The completion style of its production wells are generally completed casing perforation, and sand production is obvious after a period of exploitation. In the process of production, sand cleaning and sand discharging are often needed in the perforated section of oil well; however, after 3-5 years of production, serious sand burial still forces developers to give up the original production formation. In addition to the problem of sand production, there are many complex layers, some of them are oil-water layer, and the increase of water in the liquid production gradually affects the well flowing.\n Fishable and sectional expandable sand screen (ESS) completion technology is developed to deal with sand production and the increase of water production. The upper of the original production formation of the old wells is as the new production formation. The new formation is divided into several sections due to different physical properties. Perforation is carried out at the same time for all sections. After this, each the ESS completion string is run into each section. The top sealing hanger and the bottom packer will seal each ends of the annular between ESS and perforating casing, thus to form independent production section. In later process of production, plugging tools is run for sections if needed, so as to realize selective open/ close of different sections. Special fishing tools are developed, combined with the mechanical plastic characteristics of ESS, which can realize the fishing of the completion string. This solves the problem of fishing long string, and provides good conditions for subsequent operations.\n The research results show that two good results are obtained. One is that arranging several sections of ESS completion strings in the old well bore gives full play to the characteristics of ESS with strong flow capacity, good sand control effect, and is suitable for sand control in high-yield wells. The other is that selective open/close is realized for different sections which meets the sand control and production needs of in SHAD oilfield.\n The research results have applied to 9 wells in SHAD oilfield, and the success rate is 100%. Among them, one single well is divided into three sections, and the production is stable, the sand production is near to 0, and the sand control effect is significant. The successful application of this technology fills up the gap of multi-stage ESS completion in the Middle East.","PeriodicalId":385340,"journal":{"name":"Day 1 Tue, August 09, 2022","volume":"128 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, August 09, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209868-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

SHAD oilfield, located in one of the fields with the highest onshore production in the Middle East; more than 70% of its production wells are flowing wells, with an average single well production capacity of more than 3000 bbl/d. Its main oil production formation is loose sandstone reservoir. The completion style of its production wells are generally completed casing perforation, and sand production is obvious after a period of exploitation. In the process of production, sand cleaning and sand discharging are often needed in the perforated section of oil well; however, after 3-5 years of production, serious sand burial still forces developers to give up the original production formation. In addition to the problem of sand production, there are many complex layers, some of them are oil-water layer, and the increase of water in the liquid production gradually affects the well flowing. Fishable and sectional expandable sand screen (ESS) completion technology is developed to deal with sand production and the increase of water production. The upper of the original production formation of the old wells is as the new production formation. The new formation is divided into several sections due to different physical properties. Perforation is carried out at the same time for all sections. After this, each the ESS completion string is run into each section. The top sealing hanger and the bottom packer will seal each ends of the annular between ESS and perforating casing, thus to form independent production section. In later process of production, plugging tools is run for sections if needed, so as to realize selective open/ close of different sections. Special fishing tools are developed, combined with the mechanical plastic characteristics of ESS, which can realize the fishing of the completion string. This solves the problem of fishing long string, and provides good conditions for subsequent operations. The research results show that two good results are obtained. One is that arranging several sections of ESS completion strings in the old well bore gives full play to the characteristics of ESS with strong flow capacity, good sand control effect, and is suitable for sand control in high-yield wells. The other is that selective open/close is realized for different sections which meets the sand control and production needs of in SHAD oilfield. The research results have applied to 9 wells in SHAD oilfield, and the success rate is 100%. Among them, one single well is divided into three sections, and the production is stable, the sand production is near to 0, and the sand control effect is significant. The successful application of this technology fills up the gap of multi-stage ESS completion in the Middle East.
可打捞分段ESS完井防砂技术的成功应用&以SHAD油田为例
SHAD油田位于中东陆上产量最高的油田之一;超过70%的生产井为流动井,平均单井产能超过3000桶/天。其主要产油层为松散砂岩储层。其生产井完井方式一般为套管射孔完井,开采一段时间后出砂明显。在生产过程中,经常需要在油井射孔段进行清砂和排砂;然而,经过3-5年的生产,严重的砂埋仍然迫使开发商放弃原有的生产地层。除出砂问题外,还有许多复杂的层,其中一些是油水层,产液中水的增加逐渐影响井的流动。为解决出砂和出水量增加的问题,开发了可打捞分段扩砂筛管完井技术。将老井原生产层上部作为新生产层。由于不同的物理性质,新地层被分成几个部分。所有井段同时进行射孔。之后,每个ESS完井管柱下入每个井段。顶部密封悬挂器和底部封隔器将密封ESS与射孔套管之间的环空两端,从而形成独立的生产段。在后期的生产过程中,根据需要下入封堵工具,实现不同管段的选择性开/关。结合ESS的机械塑性特性,开发了专用打捞工具,可实现完井管柱的打捞。解决了打捞长管柱的问题,为后续作业提供了良好的条件。研究结果表明,该方法取得了两个较好的效果。一是在老井筒布置多段ESS完井管柱,充分发挥了ESS的流动能力强、防砂效果好等特点,适用于高产井防砂。二是实现了不同井段的选择性开闭,满足了SHAD油田防砂和采油的需要。研究成果已应用于SHAD油田9口井,成功率为100%。其中,单井分三段,产量稳定,出砂量接近0,防砂效果显著。该技术的成功应用填补了中东地区多级ESS完井技术的空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信