Eliminating Bradenhead Pressure Using Novel Biomineralization Technology

Dwight Randy Hiebert, J. Griffin
{"title":"Eliminating Bradenhead Pressure Using Novel Biomineralization Technology","authors":"Dwight Randy Hiebert, J. Griffin","doi":"10.2118/212893-ms","DOIUrl":null,"url":null,"abstract":"An oil well in Colorado had bradenhead pressure of 700 psi on the 9-5/8 in × 5-1/2 in annulus, prompting remediation to get bradenhead pressure below the 200-psi threshold set by the Colorado Oil and Gas Conservation Commission (COGCC) to resume production.\n A biomineralization company was contracted by an operator in Colorado to apply their proprietary biomineralization technology to the well. Cement bond logs were used to identify a micro annulus around 3,050 ft. The well was prepared by setting a bridge plug at 3,062 ft, perforating at 3,056 ft and 3,052 ft, and running tubing to the depth of the bottom perforation. Biomineralizing fluids were then pumped into the well, where they formed crystalline calcium carbonate in the micro annuli.\n After 36 hours of treatment, the injection rate dropped by several orders of magnitude. Subsequent monitoring by a state regulator determined bradenhead pressure had been eliminated and the well passed a mechanical integrity test without any additional intervention, allowing production to promptly resume.","PeriodicalId":433466,"journal":{"name":"Day 1 Tue, March 21, 2023","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, March 21, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212893-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

An oil well in Colorado had bradenhead pressure of 700 psi on the 9-5/8 in × 5-1/2 in annulus, prompting remediation to get bradenhead pressure below the 200-psi threshold set by the Colorado Oil and Gas Conservation Commission (COGCC) to resume production. A biomineralization company was contracted by an operator in Colorado to apply their proprietary biomineralization technology to the well. Cement bond logs were used to identify a micro annulus around 3,050 ft. The well was prepared by setting a bridge plug at 3,062 ft, perforating at 3,056 ft and 3,052 ft, and running tubing to the depth of the bottom perforation. Biomineralizing fluids were then pumped into the well, where they formed crystalline calcium carbonate in the micro annuli. After 36 hours of treatment, the injection rate dropped by several orders of magnitude. Subsequent monitoring by a state regulator determined bradenhead pressure had been eliminated and the well passed a mechanical integrity test without any additional intervention, allowing production to promptly resume.
利用新型生物矿化技术消除布雷登黑德压力
科罗拉多州的一口油井在9-5/8英寸× 5-1/2英寸环空的布雷登黑德压力为700 psi,需要进行补救,使布雷登黑德压力低于科罗拉多州油气保护委员会(COGCC)设定的200 psi阈值,才能恢复生产。科罗拉多州的一家运营商与一家生物矿化公司签约,将其专有的生物矿化技术应用于该井。水泥胶结测井用于识别3050英尺左右的微环空。该井的准备工作是在3062英尺处设置桥塞,在3056英尺和3052英尺处射孔,并将油管下至底部射孔深度。然后将生物矿化流体泵入井中,在微环空中形成结晶碳酸钙。治疗36小时后,注射速率下降了几个数量级。随后,国家监管机构进行了监测,确定bradenhead压力已经消除,并且在没有任何额外干预的情况下通过了机械完整性测试,可以立即恢复生产。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信