{"title":"Application of Good Mining Practice at PT. Gunung Bale, Malang, East Java","authors":"Gindang Rain Pratama","doi":"10.33084/mitl.v7i2.4259","DOIUrl":null,"url":null,"abstract":"This study aims to determine the application of Good Mining Practice at PT. Bale Mountain. Mining activities at Gunung Bale consist of processes: Stripping and Top Soil Management, Mining Production Operations, Stock Pile Activities, Quality Control and Transportation to Consumers. The methodology used is a study of the application of Good Mining Practice. Data and information are processed and tabulated for later analysis descriptively and quantitatively. The results showed that the Mining Technical PT. Gunung Bale uses the open pit mining method with a Quarry mining system with a site hill type and a pit type. Mineral conservation is carried out using the method of calculating the volume of resources and reserves with the Triangular method using the Block model concept (software used is SURPAC 6.6.1). To prevent work accidents at the mine site, warning signs are installed and Personal Protective Equipment (PPE) and first aid kits are provided. Every time starting mining activities, a safety talk is held with the workers. Environmental management includes waste management, restoration and monitoring of water quality, handling of acid mine drainage, revegetation, and making a reclamation plan. The main mining infrastructure for road construction cuts around ±2 Ha. The total length of the road is 2,731 m. Processing and refining facilities are not located in the mining area.","PeriodicalId":289030,"journal":{"name":"Media Ilmiah Teknik Lingkungan","volume":"293 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mitl.v7i2.4259","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to determine the application of Good Mining Practice at PT. Bale Mountain. Mining activities at Gunung Bale consist of processes: Stripping and Top Soil Management, Mining Production Operations, Stock Pile Activities, Quality Control and Transportation to Consumers. The methodology used is a study of the application of Good Mining Practice. Data and information are processed and tabulated for later analysis descriptively and quantitatively. The results showed that the Mining Technical PT. Gunung Bale uses the open pit mining method with a Quarry mining system with a site hill type and a pit type. Mineral conservation is carried out using the method of calculating the volume of resources and reserves with the Triangular method using the Block model concept (software used is SURPAC 6.6.1). To prevent work accidents at the mine site, warning signs are installed and Personal Protective Equipment (PPE) and first aid kits are provided. Every time starting mining activities, a safety talk is held with the workers. Environmental management includes waste management, restoration and monitoring of water quality, handling of acid mine drainage, revegetation, and making a reclamation plan. The main mining infrastructure for road construction cuts around ±2 Ha. The total length of the road is 2,731 m. Processing and refining facilities are not located in the mining area.
良好采矿规范在东爪哇玛琅Gunung Bale矿场的应用
本研究旨在确定良好采矿规范在贝尔山PT. Bale Mountain的应用。Gunung Bale的采矿活动包括以下过程:剥离和表层土壤管理、采矿生产作业、库存活动、质量控制和向消费者运输。所使用的方法是对良好采矿规范的应用进行研究。数据和信息经过处理并制成表格,以便以后进行描述性和定量分析。结果表明:古农贝尔采矿技术公司采用露天采矿法,采用场丘式和坑式采场采矿系统。矿产保护采用块模型概念,采用三角法计算资源量和储量的方法(使用的软件为SURPAC 6.6.1)。为防止矿山现场发生事故,设置了警示标志,并配备了个人防护装备和急救包。每次开始采矿活动,都要和工人们进行一次安全谈话。环境管理包括废物管理、水质恢复和监测、酸性矿井排水处理、植被恢复和制定复垦计划。道路建设的主要采矿基础设施削减约±2公顷。这条路的总长为2731米。加工和精炼设施不在矿区内。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信