{"title":"Study and diagnosis of the power transformer bushing insulation system","authors":"A. Mehta, R.N. Sharma, S. Chauhan, S. Agnihotri","doi":"10.1109/PPC.2011.6191566","DOIUrl":null,"url":null,"abstract":"Bushings are a critical component in electricity transportation. They are used in substation buildings, transformers, locomotives, and switchgear. Bushings cause more than 15% of transformer failures. The main purpose of a bushing is to transfer load currents in and out of metal (grounded) enclosures at system voltages. The insulation system breaks down, causes bushing failure results in catastrophic event such as tank rupture, violent explosion of the bushing and fire. Clearly, the risk and likelihood of collateral and personnel damage is a major concern in such an eventuality. This research is undertaken to study and diagnosis of the power transformer bushing insulation system and in-field measurement of power-factor and capacitance using the Doble M4100 insulation analyzer. The case studies on the different transformers showed how the trend of moisture and dielectric properties changes with the variation of power factor and capacitance of insulation system.","PeriodicalId":331835,"journal":{"name":"2011 IEEE Pulsed Power Conference","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Pulsed Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.2011.6191566","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

Bushings are a critical component in electricity transportation. They are used in substation buildings, transformers, locomotives, and switchgear. Bushings cause more than 15% of transformer failures. The main purpose of a bushing is to transfer load currents in and out of metal (grounded) enclosures at system voltages. The insulation system breaks down, causes bushing failure results in catastrophic event such as tank rupture, violent explosion of the bushing and fire. Clearly, the risk and likelihood of collateral and personnel damage is a major concern in such an eventuality. This research is undertaken to study and diagnosis of the power transformer bushing insulation system and in-field measurement of power-factor and capacitance using the Doble M4100 insulation analyzer. The case studies on the different transformers showed how the trend of moisture and dielectric properties changes with the variation of power factor and capacitance of insulation system.
电力变压器套管绝缘系统的研究与诊断
衬套是电力输送的关键部件。它们用于变电站建筑物、变压器、机车和开关柜。套管造成了超过15%的变压器故障。套管的主要目的是在系统电压下将负载电流输入和输出金属(接地)外壳。绝缘系统发生故障,导致套管失效,造成罐体破裂、套管剧烈爆炸、火灾等灾难性事件。显然,在这种可能发生的情况下,附带损害和人员损害的风险和可能性是一个主要问题。本课题主要对电力变压器套管绝缘系统进行了研究和诊断,并利用Doble M4100绝缘分析仪进行了功率因数和电容的现场测量。通过对不同类型变压器的实例分析,揭示了绝缘系统的功率因数和电容的变化对变压器的湿性和介电性能的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信