{"title":"Rolling horizon planning with engineering activities in semiconductor supply chains","authors":"Timm Ziarnetzky, L. Mönch, Thomas Ponsignon, H. Ehm","doi":"10.1109/COASE.2017.8256237","DOIUrl":null,"url":null,"abstract":"Process improvement activities by engineering lots are crucial to stay competitive in the semiconductor market. Production and engineering lots compete for the same equipment. We discuss two production planning formulations for a simplified semiconductor supply chain. The first formulation assumes reduced available capacity for production, while the second one directly incorporates engineering activities. Additional capacity is considered in this formulation because of learning effects that represent process improvements. The integrated formulation outperforms the conventional formulation in a rolling horizon setting with respect to profit.","PeriodicalId":445441,"journal":{"name":"2017 13th IEEE Conference on Automation Science and Engineering (CASE)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 13th IEEE Conference on Automation Science and Engineering (CASE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2017.8256237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Process improvement activities by engineering lots are crucial to stay competitive in the semiconductor market. Production and engineering lots compete for the same equipment. We discuss two production planning formulations for a simplified semiconductor supply chain. The first formulation assumes reduced available capacity for production, while the second one directly incorporates engineering activities. Additional capacity is considered in this formulation because of learning effects that represent process improvements. The integrated formulation outperforms the conventional formulation in a rolling horizon setting with respect to profit.
半导体供应链工程活动的滚动地平线规划
工艺改进活动的工程批次是至关重要的,以保持在半导体市场的竞争力。生产和工程批次竞争相同的设备。我们讨论了简化半导体供应链的两种生产计划公式。第一种方案假定现有生产能力减少,而第二种方案则直接纳入工程活动。在这个公式中考虑到额外的能力,因为学习效果代表过程改进。就利润而言,综合配方在滚动地平线设置中优于传统配方。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信