A Linear Programming Method for Unit Commitment Incorporating Generator Configurations, Reserve and Plow Constraints

M. Piekutowski, I. Rose
{"title":"A Linear Programming Method for Unit Commitment Incorporating Generator Configurations, Reserve and Plow Constraints","authors":"M. Piekutowski, I. Rose","doi":"10.1109/TPAS.1985.318903","DOIUrl":null,"url":null,"abstract":"A method of automatic unit commitment in a predominantly thermal power system is described. Linear programming techniques are used to dispatch plant at each time interval to minimise production cost over a load peak, or a daily or weekly load cycle. Generator configurations, flow constraints, functional reserve and time-limited reserve are modelled, with the capability for individual restrictions on any unit. The method has been implemented for operator usage in a control centre.","PeriodicalId":227345,"journal":{"name":"IEEE Transactions on Power Apparatus and Systems","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1985-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TPAS.1985.318903","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

A method of automatic unit commitment in a predominantly thermal power system is described. Linear programming techniques are used to dispatch plant at each time interval to minimise production cost over a load peak, or a daily or weekly load cycle. Generator configurations, flow constraints, functional reserve and time-limited reserve are modelled, with the capability for individual restrictions on any unit. The method has been implemented for operator usage in a control centre.
考虑发电机组配置、备用和犁约束的机组调度线性规划方法
介绍了一种在以火电为主的电力系统中实现机组自动调度的方法。线性规划技术用于调度工厂在每个时间间隔,以最小化生产成本在负荷高峰,或每日或每周的负荷周期。对发电机配置、流量约束、功能储备和限时储备进行了建模,具有对任何单元进行单独限制的能力。该方法已在某控制中心实施,供操作人员使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信