Usefullness of project management practices in industrialization projects – A case study

D. Perrotta, G. Fernandes, M. Araújo, Anabela Tereso, João Faria
{"title":"Usefullness of project management practices in industrialization projects – A case study","authors":"D. Perrotta, G. Fernandes, M. Araújo, Anabela Tereso, João Faria","doi":"10.1109/ICE.2017.8280005","DOIUrl":null,"url":null,"abstract":"The main objective of this paper is to identify the practitioners' perceptions of the most useful project management (PM) practices in industrialization projects, inside a first-tier automotive company, highlighting the PM differences inherent to the industrialization projects context. A questionnaire was distributed among all industrialization project managers of the company under study containing a list of current PM practices. These were derived from the literature analysis and from the field work previously conducted on the case study, comprising semi-structured interviews, focus groups, observation and document analysis. The results showed that the top twenty most useful tools and techniques is composed of very well-known and widely used tools. They cover the overall PM life cycle, from initiation to project closure, but special relevance is given to specific tools and techniques for planning, emphasizing the importance of the planning phase in industrialization projects.","PeriodicalId":421648,"journal":{"name":"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICE.2017.8280005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The main objective of this paper is to identify the practitioners' perceptions of the most useful project management (PM) practices in industrialization projects, inside a first-tier automotive company, highlighting the PM differences inherent to the industrialization projects context. A questionnaire was distributed among all industrialization project managers of the company under study containing a list of current PM practices. These were derived from the literature analysis and from the field work previously conducted on the case study, comprising semi-structured interviews, focus groups, observation and document analysis. The results showed that the top twenty most useful tools and techniques is composed of very well-known and widely used tools. They cover the overall PM life cycle, from initiation to project closure, but special relevance is given to specific tools and techniques for planning, emphasizing the importance of the planning phase in industrialization projects.
工业化项目中项目管理实践的实用性-一个案例研究
本文的主要目标是确定从业者对工业化项目中最有用的项目管理(PM)实践的看法,在一级汽车公司内部,突出工业化项目环境中固有的PM差异。在被研究的公司的所有工业化项目经理中分发了一份问卷,其中包含了当前项目管理实践的列表。这些结论来自文献分析和以前对个案研究进行的实地工作,包括半结构化访谈、焦点小组、观察和文件分析。结果表明,前20名最有用的工具和技术由非常知名和广泛使用的工具组成。它们涵盖了整个项目管理生命周期,从开始到项目结束,但是特别的相关性被赋予了用于计划的特定工具和技术,强调了工业化项目中计划阶段的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信