{"title":"Ground fault protection for DC bus using controlled power sequencing","authors":"P. Cairoli, I. Kondratiev, R. Dougal","doi":"10.1109/SECON.2010.5453880","DOIUrl":null,"url":null,"abstract":"We present a new approach to protect a multi-branch medium-voltage DC bus from ground faults. Behavior analysis of a DC distribution scheme shows that it is possible to quickly de-energize the DC bus by controlling the main converter, open a contactor to remove the faulted line, then re-energize the system. This strategy reduces the out-of-service time and avoids the use of mechanical circuit breakers and their arc-eliminating equipments. The fast response time allows unfaulted loads to ride through the process with minimal local energy storage. Our research shows that it is possible to de-energize, reconfigure, and re-energize a typical industrial DC bus 10–20 times faster than methods traditionally applied in AC circuits, and that only 470 µFarad of bus capacitance is needed for unfaulted circuits to ride-through the process uninterrupted.","PeriodicalId":286940,"journal":{"name":"Proceedings of the IEEE SoutheastCon 2010 (SoutheastCon)","volume":"25 25","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE SoutheastCon 2010 (SoutheastCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SECON.2010.5453880","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10
Abstract
We present a new approach to protect a multi-branch medium-voltage DC bus from ground faults. Behavior analysis of a DC distribution scheme shows that it is possible to quickly de-energize the DC bus by controlling the main converter, open a contactor to remove the faulted line, then re-energize the system. This strategy reduces the out-of-service time and avoids the use of mechanical circuit breakers and their arc-eliminating equipments. The fast response time allows unfaulted loads to ride through the process with minimal local energy storage. Our research shows that it is possible to de-energize, reconfigure, and re-energize a typical industrial DC bus 10–20 times faster than methods traditionally applied in AC circuits, and that only 470 µFarad of bus capacitance is needed for unfaulted circuits to ride-through the process uninterrupted.