Utilization of the Three-Dimensional Model to a Construction Production System

Keizo Kanzaki
{"title":"Utilization of the Three-Dimensional Model to a Construction Production System","authors":"Keizo Kanzaki","doi":"10.34257/gjreevol20is2pg1","DOIUrl":null,"url":null,"abstract":"The quitting a job of the expert worker and the lack of the technical transmission to the young worker with low birthrate, and the deterioration of the infrastructure institution which will increase rapidly in future will be the problem that must put up measures immediately in the construction business. CIM and i-Construction proposed by Ministry of Land, Infrastructure, Transport and Tourism enforce the improvement of the productivity of the construction site and the maintenance and check for the life cycle of the structure using three-dimensional model in order to solve such a problem, and they may be said that it is the big change of the construction production system. In this report, I survey three examples of the tool which I can utilize three-dimensional model for plan, measuring, construction, and maintenance based on a policy of CIM and i-Construction, explain an effective making method of the three-dimensional model suitable for a construction scale and contents and examine the effective utilization method and introduction effect in the construction production system.","PeriodicalId":342934,"journal":{"name":"Global Journal of Researches in Engineering","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Researches in Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34257/gjreevol20is2pg1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The quitting a job of the expert worker and the lack of the technical transmission to the young worker with low birthrate, and the deterioration of the infrastructure institution which will increase rapidly in future will be the problem that must put up measures immediately in the construction business. CIM and i-Construction proposed by Ministry of Land, Infrastructure, Transport and Tourism enforce the improvement of the productivity of the construction site and the maintenance and check for the life cycle of the structure using three-dimensional model in order to solve such a problem, and they may be said that it is the big change of the construction production system. In this report, I survey three examples of the tool which I can utilize three-dimensional model for plan, measuring, construction, and maintenance based on a policy of CIM and i-Construction, explain an effective making method of the three-dimensional model suitable for a construction scale and contents and examine the effective utilization method and introduction effect in the construction production system.
三维模型在建筑生产系统中的应用
专业工人的离职和对低出生率的年轻工人缺乏技术传授,以及未来将迅速增加的基础设施制度的恶化,将是建设企业必须立即采取措施的问题。为了解决这一问题,国土交通部提出了CIM和i-Construction,利用三维模型对施工现场的生产率进行提高,对结构的生命周期进行维护和检查,可以说是建筑生产体系的大变革。在本报告中,我调查了三个基于CIM和I - construction的政策,我可以利用三维模型进行规划、测量、施工和维护的工具实例,说明了一种适合于施工规模和内容的三维模型的有效制作方法,并检验了在施工生产系统中的有效利用方法和引入效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信