An ontological approach for planning and scheduling in primary steel production

M. Dobrev, D. Gocheva, I. Batchkova
{"title":"An ontological approach for planning and scheduling in primary steel production","authors":"M. Dobrev, D. Gocheva, I. Batchkova","doi":"10.1109/IS.2008.4670433","DOIUrl":null,"url":null,"abstract":"Effective integration between manufacturing execution systems and business and logistics systems has been of great interest for a long time. Essential part in enterprise integration is the task of optimal planning and scheduling. An ontological approach consisting of integrated ontologies: a core meta-ontology, according to ANSI/ISA S95 standard and different domain specific ontologies for the primary steelmaking is proposed. For the purposes of planning and scheduling the integration between the core meta-ontology and a hot strip mill domain ontology is achieved and a case study is presented. Web Ontology Language (OWL) and Protege as an editor and knowledge acquisition tool are used.","PeriodicalId":305750,"journal":{"name":"2008 4th International IEEE Conference Intelligent Systems","volume":"554 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 4th International IEEE Conference Intelligent Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IS.2008.4670433","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Effective integration between manufacturing execution systems and business and logistics systems has been of great interest for a long time. Essential part in enterprise integration is the task of optimal planning and scheduling. An ontological approach consisting of integrated ontologies: a core meta-ontology, according to ANSI/ISA S95 standard and different domain specific ontologies for the primary steelmaking is proposed. For the purposes of planning and scheduling the integration between the core meta-ontology and a hot strip mill domain ontology is achieved and a case study is presented. Web Ontology Language (OWL) and Protege as an editor and knowledge acquisition tool are used.
初级钢生产计划调度的本体论方法
长期以来,制造执行系统与业务和物流系统之间的有效集成一直受到人们的极大关注。企业集成的核心任务是优化规划和调度任务。提出了一种由集成本体组成的本体方法:根据ANSI/ISA S95标准的核心元本体和针对初级炼钢的不同领域特定本体。为了规划和调度的目的,实现了核心元本体与热连轧领域本体的集成,并给出了实例研究。使用Web Ontology Language (OWL)和Protege作为编辑器和知识获取工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信