Study of the underground tunnel planning. Cognitive modelling

N. Pankratova, Danylo Musiienko
{"title":"Study of the underground tunnel planning. Cognitive modelling","authors":"N. Pankratova, Danylo Musiienko","doi":"10.20535/srit.2308-8893.2023.1.03","DOIUrl":null,"url":null,"abstract":"A study of the underground tunnel planning reliability for megacities is proposed based on the use of foresight and cognitive modeling methodologies. Using the foresight methodology allows, with the help of expert estimation procedures, to identify critical technologies and build alternatives of scenarios with quantitative characteristics. For the justified implementation of a particular scenario, cognitive modeling is used, which allows to build causal relationships based on knowledge and experience, understand and analyze the behavior of a complex system for a strategic perspective with a large number of interconnections and interdependencies. The suggested study allows the reliability planning of underground tunnels on the basis of reasonable scenarios selection and justification of their creation priority.","PeriodicalId":330635,"journal":{"name":"System research and information technologies","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"System research and information technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20535/srit.2308-8893.2023.1.03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A study of the underground tunnel planning reliability for megacities is proposed based on the use of foresight and cognitive modeling methodologies. Using the foresight methodology allows, with the help of expert estimation procedures, to identify critical technologies and build alternatives of scenarios with quantitative characteristics. For the justified implementation of a particular scenario, cognitive modeling is used, which allows to build causal relationships based on knowledge and experience, understand and analyze the behavior of a complex system for a strategic perspective with a large number of interconnections and interdependencies. The suggested study allows the reliability planning of underground tunnels on the basis of reasonable scenarios selection and justification of their creation priority.
地下隧道规划研究。认知模型
提出了一种基于前瞻性和认知建模方法的超大城市地下隧道规划可靠性研究方法。在专家评估程序的帮助下,使用预见方法可以识别关键技术,并建立具有定量特征的方案替代方案。对于特定场景的合理实现,使用认知建模,它允许基于知识和经验构建因果关系,从具有大量互连和相互依赖的战略角度理解和分析复杂系统的行为。建议的研究允许在合理的方案选择和创建优先级论证的基础上进行地下隧道的可靠性规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信