Optimum Design for Proppant Fracturing to Unlock Oil Potential in a Marginal Low Quality Burgan Sands in the Greater Burgan Field

O. Al-Zankawi, Dunya Jafaar, S. Al-Kandari, M. Yaser, R. Prakash
{"title":"Optimum Design for Proppant Fracturing to Unlock Oil Potential in a Marginal Low Quality Burgan Sands in the Greater Burgan Field","authors":"O. Al-Zankawi, Dunya Jafaar, S. Al-Kandari, M. Yaser, R. Prakash","doi":"10.2118/213717-ms","DOIUrl":null,"url":null,"abstract":"\n In Greater Burgan Field, Burgan formation is the main oil producing reservoir since the start of oil production and with the reservoir mostly depleted, the focus in the asset team is now on the lower quality Upper Burgan (BGSU) sands with substantial remaining oil. In view of this, a multidisciplinary team is formed to evaluate opportunities to stimulate the BGSU reservoir, establish and sustain production from this reservoir to meet the production targets. The objective is to unlock potential in these tight sands especially targeting to revive old wells back which have drained the underlaying BGSM sands and have significant opportunities in the BGSU. The best way to exploit the resource potential of BGSU for its remaining oil is through hydraulic fracturing technology with an emphasis of its implementation via a thorough review of reservoir, well and completion data maximizing wellbore utilization and minimizing CAPEX investment.\n The review involves screening a batch of wells with low rock quality and low permeability, away from heavy oil zones and above bubble point pressure, with good shale barrier beneath to avoid fracture propagating into the underlying aquifer. In total, about 100 wells are reviewed from across the Greater Burgan Field for this exercise. Latest reservoir pressure and oil saturation maps for the target BGSU reservoir, built in-house by the asset technical team, are being used to identify wells for potential hydraulic fracturing implementation. Upon a review of historical Proppant fracturing jobs that were performed in five wells in 2015-16 in the BGSU sands, it was summarized that there was a substantial increment to the well productivity, in some cases up to four folds. After the review, detailed numerical well modeling of these five wells is performed with and without fracturing showed that well productivity increase by 2 to 3 times for most of the wells. Although the well productivity improved post stimulation, the wells had high drawdown pressures which resulted in early water breakthrough in few wells.\n An optimum well productivity can be achieved with large proppant volume placement in the reservoir to connect with the sands away from the wellbore. However, with large volumes there is significant risk of frac propagating \"out of zone\" increasing the risk of early water breakthrough. Presence of a shale barrier above and below the target zone is an important criterion in candidate selection and design the proppant volume to keep the fracture growth within the target zones and not reach to the zones, especially the underlying BGSM formation, having water.\n With the lessons-learnt from the past fracturing jobs, detailed modeling and simulation of well performance, a refined list of potential hydraulic fracturing candidates can be generated combined with advancements in the fracturing technology which will greatly enhance the success probability of the stimulation with maximizing well productivity. The successful implementation in the candidate wells will lead to unlocking oil reserve in low rock quality reservoir allowing the development of these low permeability sands for the BGSU upper which will help to achieve the aggressive production target of the South & East Kuwait (SEK) asset.","PeriodicalId":396949,"journal":{"name":"Day 1 Sun, February 19, 2023","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Sun, February 19, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/213717-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Greater Burgan Field, Burgan formation is the main oil producing reservoir since the start of oil production and with the reservoir mostly depleted, the focus in the asset team is now on the lower quality Upper Burgan (BGSU) sands with substantial remaining oil. In view of this, a multidisciplinary team is formed to evaluate opportunities to stimulate the BGSU reservoir, establish and sustain production from this reservoir to meet the production targets. The objective is to unlock potential in these tight sands especially targeting to revive old wells back which have drained the underlaying BGSM sands and have significant opportunities in the BGSU. The best way to exploit the resource potential of BGSU for its remaining oil is through hydraulic fracturing technology with an emphasis of its implementation via a thorough review of reservoir, well and completion data maximizing wellbore utilization and minimizing CAPEX investment. The review involves screening a batch of wells with low rock quality and low permeability, away from heavy oil zones and above bubble point pressure, with good shale barrier beneath to avoid fracture propagating into the underlying aquifer. In total, about 100 wells are reviewed from across the Greater Burgan Field for this exercise. Latest reservoir pressure and oil saturation maps for the target BGSU reservoir, built in-house by the asset technical team, are being used to identify wells for potential hydraulic fracturing implementation. Upon a review of historical Proppant fracturing jobs that were performed in five wells in 2015-16 in the BGSU sands, it was summarized that there was a substantial increment to the well productivity, in some cases up to four folds. After the review, detailed numerical well modeling of these five wells is performed with and without fracturing showed that well productivity increase by 2 to 3 times for most of the wells. Although the well productivity improved post stimulation, the wells had high drawdown pressures which resulted in early water breakthrough in few wells. An optimum well productivity can be achieved with large proppant volume placement in the reservoir to connect with the sands away from the wellbore. However, with large volumes there is significant risk of frac propagating "out of zone" increasing the risk of early water breakthrough. Presence of a shale barrier above and below the target zone is an important criterion in candidate selection and design the proppant volume to keep the fracture growth within the target zones and not reach to the zones, especially the underlying BGSM formation, having water. With the lessons-learnt from the past fracturing jobs, detailed modeling and simulation of well performance, a refined list of potential hydraulic fracturing candidates can be generated combined with advancements in the fracturing technology which will greatly enhance the success probability of the stimulation with maximizing well productivity. The successful implementation in the candidate wells will lead to unlocking oil reserve in low rock quality reservoir allowing the development of these low permeability sands for the BGSU upper which will help to achieve the aggressive production target of the South & East Kuwait (SEK) asset.
支撑剂压裂优化设计,释放Greater Burgan油田边缘低质量Burgan砂的石油潜力
在Greater Burgan油田,Burgan地层自开始生产以来一直是主要的产油层,随着油藏的大部分枯竭,资产团队现在的重点是含有大量剩余油的较低质量的Upper Burgan (BGSU)砂。鉴于此,公司组建了一个多学科团队,以评估BGSU油藏的增产机会,建立并维持该油藏的生产,以达到生产目标。目标是释放这些致密砂岩的潜力,特别是针对那些已经排干BGSM砂层的老井,这些井在BGSU中具有重要的机会。开发BGSU剩余油资源潜力的最佳方法是通过水力压裂技术,重点是通过对储层、井和完井数据的全面审查,最大限度地提高井筒利用率,最大限度地减少资本支出。该评价包括筛选一批低岩石质量和低渗透率的井,这些井远离稠油区,高于泡点压力,下方有良好的页岩屏障,以避免裂缝扩展到下面的含水层。本次作业共对Greater Burgan油田的100口井进行了评估。BGSU目标油藏的最新油藏压力和含油饱和度图由资产技术团队内部绘制,用于确定可能实施水力压裂的井。通过回顾2015- 2016年在BGSU砂区进行的5口井的支撑剂压裂作业,可以总结出,在某些情况下,支撑剂压裂作业的产能大幅提高,甚至达到了四倍。经过评估,对这5口井进行了详细的压裂和不压裂数值模拟,结果表明,大多数井的产能提高了2 ~ 3倍。虽然增产后产能有所提高,但由于井的降压过高,导致少数井早期见水。通过在储层中放置大量支撑剂来连接远离井筒的砂层,可以实现最佳的油井产能。然而,在体积较大的情况下,裂缝扩展到“层外”的风险很大,增加了早期见水的风险。目标层上下是否存在页岩屏障是选择和设计支撑剂体积的一个重要标准,以保持裂缝在目标层内的生长,而不是到达目标层,特别是下部有水的BGSM地层。根据以往压裂作业的经验教训,对井的性能进行详细的建模和模拟,结合压裂技术的进步,可以生成一份精细的潜在水力压裂候选清单,这将大大提高增产的成功率,最大限度地提高油井的产能。在候选井的成功实施将导致释放低岩质储层的石油储量,从而为BGSU上部开发这些低渗透砂岩,这将有助于实现South & East Kuwait (SEK)资产的积极生产目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书