{"title":"Challenges of supplying electric power to a large industrial customer in rural areas","authors":"J. L. Verwers, J. R. Sovers","doi":"10.1109/REPCON.1999.768693","DOIUrl":null,"url":null,"abstract":"As the economy in rural areas changes, many local leaders are attracting new large industrial clients into the area. When a large industrial business does locate in a service area, the rural electric cooperative is faced with many issues: the impact of the new load on existing system infrastructures; the potential issue of power quality on its system; and its impact on its customers. This requires that before a large industrial customer is added, careful studies are made regarding rates, interconnection guidelines, and protection issues. The new customer may require state-of-the-art relay devices and fast-track type installations to meet startup demands. The complexity of the new systems and fast-track construction may require the cooperative to augment its staff with added expertise. This paper discusses these challenges of supplying electric power to a large industrial customer in rural areas.","PeriodicalId":364482,"journal":{"name":"1999 Rural Electric Power Conference (Cat. No. 99CH36302)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1999 Rural Electric Power Conference (Cat. No. 99CH36302)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.1999.768693","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8
Abstract
As the economy in rural areas changes, many local leaders are attracting new large industrial clients into the area. When a large industrial business does locate in a service area, the rural electric cooperative is faced with many issues: the impact of the new load on existing system infrastructures; the potential issue of power quality on its system; and its impact on its customers. This requires that before a large industrial customer is added, careful studies are made regarding rates, interconnection guidelines, and protection issues. The new customer may require state-of-the-art relay devices and fast-track type installations to meet startup demands. The complexity of the new systems and fast-track construction may require the cooperative to augment its staff with added expertise. This paper discusses these challenges of supplying electric power to a large industrial customer in rural areas.