Transportation network model with time delay for flood lamination strategy

H. Nouasse, P. Chiron, B. Archimède
{"title":"Transportation network model with time delay for flood lamination strategy","authors":"H. Nouasse, P. Chiron, B. Archimède","doi":"10.1109/ICAT.2013.6684091","DOIUrl":null,"url":null,"abstract":"Flooding due to rivers overflowing have affected this year many countries in the world. The engendered problems, due to their intensity, are relative to goods and persons safety, and often cause a sharp increase of the insurance costs, which is no more tolerable in the actual economic context. To prevent these problems, it is necessary to limit water heights downstream the streams. In the literature, numerous described works were done on flows modelling and management. The work presented in this paper, is interested in the quantitative management by means of floods diversion areas placed along the river and for which location and sizing are known. A management method computing the height of gates opening at each time step is proposed. The strategy is based on a transportation network model of the flood diversion area system including the time transfer delays. It allows the computation of the water volumes to be stored in time. Simulation results for different flood episode are discussed.","PeriodicalId":348701,"journal":{"name":"2013 XXIV International Conference on Information, Communication and Automation Technologies (ICAT)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 XXIV International Conference on Information, Communication and Automation Technologies (ICAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAT.2013.6684091","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Flooding due to rivers overflowing have affected this year many countries in the world. The engendered problems, due to their intensity, are relative to goods and persons safety, and often cause a sharp increase of the insurance costs, which is no more tolerable in the actual economic context. To prevent these problems, it is necessary to limit water heights downstream the streams. In the literature, numerous described works were done on flows modelling and management. The work presented in this paper, is interested in the quantitative management by means of floods diversion areas placed along the river and for which location and sizing are known. A management method computing the height of gates opening at each time step is proposed. The strategy is based on a transportation network model of the flood diversion area system including the time transfer delays. It allows the computation of the water volumes to be stored in time. Simulation results for different flood episode are discussed.
洪水分层策略的时滞交通网络模型
今年,河流泛滥造成的洪水影响了世界上许多国家。所产生的问题,由于其强度,是相对于货物和人员的安全,往往造成保险费用的急剧增加,这是在实际的经济背景下,更不能容忍。为了防止这些问题,有必要限制下游河流的水位高度。在文献中,有许多关于流动建模和管理的描述工作。本文中提出的工作是通过沿河流放置的洪水导流区进行定量管理,其位置和规模是已知的。提出了一种计算各时间步长的闸门开启高度的管理方法。该策略基于一个考虑时间转移延迟的调洪区系统交通网络模型。它允许计算的水量存储在时间。讨论了不同汛期的模拟结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信