Incorporating Security Requirements Engineering into the Rational Unified Process

N. Mead, V. Viswanathan, J. Zhan
{"title":"Incorporating Security Requirements Engineering into the Rational Unified Process","authors":"N. Mead, V. Viswanathan, J. Zhan","doi":"10.1109/ISA.2008.19","DOIUrl":null,"url":null,"abstract":"This paper provides a roadmap for developing security-critical projects using rational unified process as a framework for development. The security quality requirements engineering (SQUARE) methodology provides a way to address security issues early in the development lifecycle. SQUARE can be more effective when it fits into an organization's existing development process. Hence this paper describes a way to fit the SQUARE methodology into the rational unified process.","PeriodicalId":212375,"journal":{"name":"2008 International Conference on Information Security and Assurance (isa 2008)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Information Security and Assurance (isa 2008)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISA.2008.19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

This paper provides a roadmap for developing security-critical projects using rational unified process as a framework for development. The security quality requirements engineering (SQUARE) methodology provides a way to address security issues early in the development lifecycle. SQUARE can be more effective when it fits into an organization's existing development process. Hence this paper describes a way to fit the SQUARE methodology into the rational unified process.
将安全需求工程整合到Rational统一过程中
本文提供了使用合理的统一过程作为开发框架来开发安全关键项目的路线图。安全性质量需求工程(SQUARE)方法提供了一种在开发生命周期早期处理安全性问题的方法。当SQUARE适合组织现有的开发过程时,它会更有效。因此,本文描述了一种将SQUARE方法融入到合理的统一过程中的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信