A. Shatil, Shuvra Saha, Kazi Firoz Ahmed, A. N. M. S. Hasan, S. Rahman
{"title":"Design and Comparison of Floating Solar Panel for Chalan Beel","authors":"A. Shatil, Shuvra Saha, Kazi Firoz Ahmed, A. N. M. S. Hasan, S. Rahman","doi":"10.1109/icaeee54957.2022.9836432","DOIUrl":null,"url":null,"abstract":"Floating solar panels become a recent trend in solar energy harvesting systems. Countries like Bangladesh where land is scarce and densely populated could conduct feasibility tests about these floating panels. There are many rivers, canals, beel around Bangladesh which could be a perfect place for such kind of experiment. This paper investigates the possibility to set up floating solar panels in Chalan Beel, Natore, Rajshahi. Throughout the experimental setup, it is also observed the comparison between the ground-mounted panel and floating panel based on electrical parameters like output power along with costing. After the analysis, it is found that the energy conversion cost in the floating panel set up is 0.57 cents/kWh, which is acceptable comparably with other countries.","PeriodicalId":383872,"journal":{"name":"2022 International Conference on Advancement in Electrical and Electronic Engineering (ICAEEE)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 International Conference on Advancement in Electrical and Electronic Engineering (ICAEEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/icaeee54957.2022.9836432","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Floating solar panels become a recent trend in solar energy harvesting systems. Countries like Bangladesh where land is scarce and densely populated could conduct feasibility tests about these floating panels. There are many rivers, canals, beel around Bangladesh which could be a perfect place for such kind of experiment. This paper investigates the possibility to set up floating solar panels in Chalan Beel, Natore, Rajshahi. Throughout the experimental setup, it is also observed the comparison between the ground-mounted panel and floating panel based on electrical parameters like output power along with costing. After the analysis, it is found that the energy conversion cost in the floating panel set up is 0.57 cents/kWh, which is acceptable comparably with other countries.