Sustainable Practices Influencing Timely Delivery of Building Construction Project

Shehu, S., Shehu, R., Aliyu, U.
{"title":"Sustainable Practices Influencing Timely Delivery of Building Construction Project","authors":"Shehu, S., Shehu, R., Aliyu, U.","doi":"10.22452/jpmp.vol3no1.1","DOIUrl":null,"url":null,"abstract":"It is no longer a contention as various scholars in the field of management and construction are in unison that the construction industry worldwide is a potent motivator that can induce the economic growth and development of any society. A key metric for evaluating the success of building projects around the world is timely delivery. According to earlier studies, building development projects in northern Nigeria encountered delivery schedule delays. To ensure efficiency in delivery time, this study adopts a survey that was created to evaluate sustainable practices impacting timely delivery of building construction project in Gombe state. Professionals who represented the clients, consultants, and contractors were given a total of 88 questionnaires at random, and the administration of the questionnaire received a response rate of 70.45%. The statistical software for social science was used to analyze the data and provide descriptive and inferential statistical metrics. The survey's resultsshowed that more than 70% of respondents had experienced delays in timely delivery of 1–12 months at most. The most significant sustainable practices influencing timely delivery of building projects with high relative index are the employment of skilled and competent labour; availability of materials; periodic monitoring, controlling, and updating of the progress of work; availability of effective supervision and management of staff; and availability of materials. The sustainable practices were further classified into: the economic, management, and motivational policy strategies, with a 33.30% cause-effect increase on timely completion of building construction projects. These facts lead the study to the conclusion that the problem of delays in building construction projects is obviously inescapable. Hence, this study recommends that: there should be concerted efforts in collaboration by various stakeholders involve in building construction project, and all necessary practices should be deployed towards improving timely delivery of building construction project.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"434 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management Practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22452/jpmp.vol3no1.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It is no longer a contention as various scholars in the field of management and construction are in unison that the construction industry worldwide is a potent motivator that can induce the economic growth and development of any society. A key metric for evaluating the success of building projects around the world is timely delivery. According to earlier studies, building development projects in northern Nigeria encountered delivery schedule delays. To ensure efficiency in delivery time, this study adopts a survey that was created to evaluate sustainable practices impacting timely delivery of building construction project in Gombe state. Professionals who represented the clients, consultants, and contractors were given a total of 88 questionnaires at random, and the administration of the questionnaire received a response rate of 70.45%. The statistical software for social science was used to analyze the data and provide descriptive and inferential statistical metrics. The survey's resultsshowed that more than 70% of respondents had experienced delays in timely delivery of 1–12 months at most. The most significant sustainable practices influencing timely delivery of building projects with high relative index are the employment of skilled and competent labour; availability of materials; periodic monitoring, controlling, and updating of the progress of work; availability of effective supervision and management of staff; and availability of materials. The sustainable practices were further classified into: the economic, management, and motivational policy strategies, with a 33.30% cause-effect increase on timely completion of building construction projects. These facts lead the study to the conclusion that the problem of delays in building construction projects is obviously inescapable. Hence, this study recommends that: there should be concerted efforts in collaboration by various stakeholders involve in building construction project, and all necessary practices should be deployed towards improving timely delivery of building construction project.
影响建筑工程项目及时交付的可持续实践
管理和建设领域的学者一致认为,世界范围内的建筑业是一个强有力的动力,可以诱导任何社会的经济增长和发展,这已不再是一个争论。评估世界各地建设项目成功的一个关键指标是及时交付。根据早期的研究,尼日利亚北部的建筑开发项目遇到了交付时间表的延误。为了确保交付时间的效率,本研究采用了一项调查,该调查旨在评估影响贡贝州建筑建设项目及时交付的可持续实践。代表客户、顾问和承包商的专业人员随机发放了88份问卷,问卷管理的回复率为70.45%。使用社会科学统计软件对数据进行分析,并提供描述性和推断性统计指标。调查结果显示,超过70%的受访者曾经历过最多1-12个月的准时交货延迟。影响高相对指数建筑项目及时交付的最重要的可持续做法是雇用熟练和称职的劳动力;材料的可得性;定期监督、控制和更新工作进度;对工作人员是否有有效的监督和管理;材料的可用性。可持续实践进一步分为:经济、管理和激励政策策略,对按时完成建筑建设项目的因果效应增加了33.30%。这些事实使研究得出这样的结论:建筑建设项目的延误问题显然是不可避免的。因此,本研究建议:参与建筑工程的各持份者应齐心协力,并采取一切必要的措施,以改善建筑工程的及时交付。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信