A Study of Analysis of Attribute and Operation based on COTS System

Eun-Ser Lee, Joong-soo Kim
{"title":"A Study of Analysis of Attribute and Operation based on COTS System","authors":"Eun-Ser Lee, Joong-soo Kim","doi":"10.3745/KIPSTD.2010.17D.6.443","DOIUrl":null,"url":null,"abstract":"COTS system is increasingly seen as one of the main jobs of reuse development. It involves reliability of COTS that might affect the project schedule or the quality of the software being developed and taking action to avoid these risks. The results of the COTS analysis should be documented in the project plan along with an analysis of the attribute and operation. Effective risk management makes it easier to cope with problems and to ensure that these do not lead to unacceptable budget or schedule slippage. This research provides criteria of analysis of risk items to the estimation of process milestone on COTS development.","PeriodicalId":348746,"journal":{"name":"The Kips Transactions:partd","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Kips Transactions:partd","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3745/KIPSTD.2010.17D.6.443","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

COTS system is increasingly seen as one of the main jobs of reuse development. It involves reliability of COTS that might affect the project schedule or the quality of the software being developed and taking action to avoid these risks. The results of the COTS analysis should be documented in the project plan along with an analysis of the attribute and operation. Effective risk management makes it easier to cope with problems and to ensure that these do not lead to unacceptable budget or schedule slippage. This research provides criteria of analysis of risk items to the estimation of process milestone on COTS development.
基于COTS系统的属性分析与操作研究
COTS系统越来越被视为复用开发的主要工作之一。它涉及到COTS的可靠性,这可能会影响项目进度或正在开发的软件的质量,并采取措施避免这些风险。COTS分析的结果应该连同对属性和操作的分析一起记录在项目计划中。有效的风险管理使处理问题变得更容易,并确保这些问题不会导致不可接受的预算或进度延迟。本研究为COTS开发过程里程碑的估计提供了风险项分析的准则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信