Parallel processor scheduling problems with optimal due interval

A. Janiak, M. Marek
{"title":"Parallel processor scheduling problems with optimal due interval","authors":"A. Janiak, M. Marek","doi":"10.1109/ENC.2004.1342631","DOIUrl":null,"url":null,"abstract":"In the paper we consider two problems, in which we should find a schedule of jobs on parallel processors and a common due interval determination for all jobs such that the criterion value is minimized. A due interval is a generalization of the classical due date and describes a time interval, in which a job should be finished. In the first problem we minimize the sum of the total tardiness, total earliness and due interval size. In the second problem, we minimize the weighted maximum of the following three parts: maximum tardiness, maximum earliness and due interval size. We proved that the considered problems are equivalent to the strong NP-hard classical scheduling problem with the parallel processors subject to the minimization of the makespan criterion.","PeriodicalId":103999,"journal":{"name":"Proceedings of the Fifth Mexican International Conference in Computer Science, 2004. ENC 2004.","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Fifth Mexican International Conference in Computer Science, 2004. ENC 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENC.2004.1342631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

In the paper we consider two problems, in which we should find a schedule of jobs on parallel processors and a common due interval determination for all jobs such that the criterion value is minimized. A due interval is a generalization of the classical due date and describes a time interval, in which a job should be finished. In the first problem we minimize the sum of the total tardiness, total earliness and due interval size. In the second problem, we minimize the weighted maximum of the following three parts: maximum tardiness, maximum earliness and due interval size. We proved that the considered problems are equivalent to the strong NP-hard classical scheduling problem with the parallel processors subject to the minimization of the makespan criterion.
具有最优到期时间间隔的并行处理器调度问题
在本文中,我们考虑了两个问题,即在并行处理器上找到一个作业调度,并确定所有作业的公共应有间隔,使准则值最小。到期时间间隔是经典到期日期的概括,描述了工作应该完成的时间间隔。在第一个问题中,我们最小化总迟到、总提前和到期间隔大小的总和。在第二个问题中,我们最小化以下三个部分的加权最大值:最大延迟,最大提前和到期区间大小。我们证明了所考虑的问题等价于强NP-hard经典调度问题,其中并行处理器服从最大时间跨度准则的最小化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书