New way of planning of the national transmission grid within the Italian context

Francesco Del Pizzo, E. Carlini, T. B. Scirocco, Francesco Dicuonzo, Claudio Armillei, A. Urbanelli, Antonio Zanghì
{"title":"New way of planning of the national transmission grid within the Italian context","authors":"Francesco Del Pizzo, E. Carlini, T. B. Scirocco, Francesco Dicuonzo, Claudio Armillei, A. Urbanelli, Antonio Zanghì","doi":"10.23919/AEIT56783.2022.9951832","DOIUrl":null,"url":null,"abstract":"In the next future, the Italian National Electricity Transmission Grid Development Plan (NDP) will be increasingly plastered, with the growing difficulty in building new overhead lines (OHL) useful for the country, due to authorization and economic constraints. The changing of the generation mix and growing demand for carbon-free electricity will require drastic and challenging changes in the infrastructure and topology of the electricity system. Today there is a substantial \"asynchrony\" between the faster Renewable Energy Sources (RES) transmission grid connection requests and the related permitting process with respect to the authorization and construction procedures of the grid reinforcements. The projects envisaged in the Terna’s NDP 2021 are adequate to contain overgeneration by renewable generation. However, considering the actual development of RES and their territorial distribution as well as the actual development of storage systems (and their regulation), new grid reinforcements that are not yet planned may also be required. Thus, among different alternatives, an HVDC overlay concept has been evaluated as suitable cost-competitive solution for complete decarbonization, a better renewables and territory exploitation and growing electrical demand, through its Net Transfer Capacity increase between bidding zones. Rather than building new AC OHL, the described development strategy contemplates to increase the transmission capacity of existing corridors minimizing local opposition and regulatory obstacles through the DC conversion and multiterminal type projects. Given the strong rise of EU electricity prices, begun during the second half of 2021, the DC layer concept might represent a solution to faster RES integration.","PeriodicalId":253384,"journal":{"name":"2022 AEIT International Annual Conference (AEIT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT56783.2022.9951832","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In the next future, the Italian National Electricity Transmission Grid Development Plan (NDP) will be increasingly plastered, with the growing difficulty in building new overhead lines (OHL) useful for the country, due to authorization and economic constraints. The changing of the generation mix and growing demand for carbon-free electricity will require drastic and challenging changes in the infrastructure and topology of the electricity system. Today there is a substantial "asynchrony" between the faster Renewable Energy Sources (RES) transmission grid connection requests and the related permitting process with respect to the authorization and construction procedures of the grid reinforcements. The projects envisaged in the Terna’s NDP 2021 are adequate to contain overgeneration by renewable generation. However, considering the actual development of RES and their territorial distribution as well as the actual development of storage systems (and their regulation), new grid reinforcements that are not yet planned may also be required. Thus, among different alternatives, an HVDC overlay concept has been evaluated as suitable cost-competitive solution for complete decarbonization, a better renewables and territory exploitation and growing electrical demand, through its Net Transfer Capacity increase between bidding zones. Rather than building new AC OHL, the described development strategy contemplates to increase the transmission capacity of existing corridors minimizing local opposition and regulatory obstacles through the DC conversion and multiterminal type projects. Given the strong rise of EU electricity prices, begun during the second half of 2021, the DC layer concept might represent a solution to faster RES integration.
意大利国家输电网规划的新方法
在未来的一段时间里,意大利国家输电网发展计划(NDP)将面临越来越多的挑战,由于授权和经济限制,建设对该国有用的新架空线路(OHL)的难度越来越大。发电结构的变化和对无碳电力日益增长的需求将要求电力系统的基础设施和拓扑结构发生巨大而具有挑战性的变化。如今,快速可再生能源(RES)输电网连接请求与电网加固的授权和建设程序相关的许可过程之间存在着实质性的“异步”。Terna的NDP 2021中设想的项目足以控制可再生能源发电的过剩。然而,考虑到可再生能源的实际发展及其地域分布以及存储系统的实际发展(及其监管),可能还需要尚未规划的新电网加固。因此,在不同的替代方案中,HVDC覆盖概念被评估为完全脱碳,更好的可再生能源和领土开发以及不断增长的电力需求的合适的成本竞争力解决方案,通过其在投标区域之间的净转移容量增加。所描述的发展战略不是建立新的交流OHL,而是考虑通过直流转换和多终端类型的项目来增加现有走廊的传输能力,最大限度地减少当地的反对和监管障碍。考虑到2021年下半年开始的欧盟电价的强劲上涨,直流层的概念可能代表了更快的可再生能源整合的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信