{"title":"Analysis of the IEC 61850 protocol when used for communication during maintenance operation in an electrical substation grid","authors":"Dion Njova, K. Ogudo, P. Umenne","doi":"10.1145/3415088.3415133","DOIUrl":null,"url":null,"abstract":"During Substation maintenance a bay is taken out of service, tested and while testing traffic is generated on the Substation Communication Network (SCN) in a power utility. Currently in an eastern SCN at the ESKOM power utility in South Africa DNP3 protocol is utilized to communicate. This paper models the said SCN while using the International Electrotechnical Commission (IEC) 61850 protocol to communicate in order to improve performance in the network. Hence a model of a Substation Communication Network that is using the IEC 61850 protocol has been modeled in Optimized Network Engineering Tool (OPNET). IEC 61850 is a protocol that can be used in a power utility to provide interoperability between different vendors of Intelligent Electronic Devices (IED's). Most of the IED's sold by manufacturers for power utility networks support IEC 61850 protocol. The model has three scenarios and they are normal operation of a Substation, maintenance in a Substation and Buszone operation at a Substation. In these scenarios packet end to end delay of GOOSE, GSSE, SV and MMS messages are monitored. The throughput from the IED under maintenance and the throughput at the Substation RTU end is monitored in the Model. The design of the Substation Communication Network using IEC 61850 will assist when trying to predict the behavior of the network with regards to this specific protocol during maintenance and when there are faults in the communication network or IED's.","PeriodicalId":274948,"journal":{"name":"Proceedings of the 2nd International Conference on Intelligent and Innovative Computing Applications","volume":"280 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2nd International Conference on Intelligent and Innovative Computing Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3415088.3415133","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

During Substation maintenance a bay is taken out of service, tested and while testing traffic is generated on the Substation Communication Network (SCN) in a power utility. Currently in an eastern SCN at the ESKOM power utility in South Africa DNP3 protocol is utilized to communicate. This paper models the said SCN while using the International Electrotechnical Commission (IEC) 61850 protocol to communicate in order to improve performance in the network. Hence a model of a Substation Communication Network that is using the IEC 61850 protocol has been modeled in Optimized Network Engineering Tool (OPNET). IEC 61850 is a protocol that can be used in a power utility to provide interoperability between different vendors of Intelligent Electronic Devices (IED's). Most of the IED's sold by manufacturers for power utility networks support IEC 61850 protocol. The model has three scenarios and they are normal operation of a Substation, maintenance in a Substation and Buszone operation at a Substation. In these scenarios packet end to end delay of GOOSE, GSSE, SV and MMS messages are monitored. The throughput from the IED under maintenance and the throughput at the Substation RTU end is monitored in the Model. The design of the Substation Communication Network using IEC 61850 will assist when trying to predict the behavior of the network with regards to this specific protocol during maintenance and when there are faults in the communication network or IED's.
IEC 61850协议在变电站电网维护操作期间用于通信的分析
在变电站维护期间,一个变电站停止服务,进行测试,同时在电力公司的变电站通信网络(SCN)上产生测试流量。目前,在南非ESKOM电力公司的东部SCN中,使用DNP3协议进行通信。本文在使用国际电工委员会(IEC) 61850协议进行通信的同时对上述SCN进行建模,以提高网络性能。因此,在优化网络工程工具(OPNET)中建立了一个使用IEC 61850协议的变电站通信网络模型。IEC 61850是一种可用于电力公用事业的协议,可在不同的智能电子设备(IED)供应商之间提供互操作性。大多数制造商为电力公用事业网络销售的IED支持IEC 61850协议。该模型有三个场景,分别是变电站的正常运行、变电站的维护和变电站的Buszone操作。在这种情况下,可以监控GOOSE、GSSE、SV和MMS报文的端到端延迟。在模型中监测了处于维护状态的IED的吞吐量和变电站RTU端的吞吐量。使用IEC 61850的变电站通信网络的设计将有助于在维护期间以及在通信网络或IED中出现故障时尝试预测与该特定协议相关的网络行为。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信