Externalities of Soil Stabilization in the Construction of Main Transportation Infrastructures. The Case of the High Speed Railway in North Italy: Economical and Environmental Benefits

A. Benedetto
{"title":"Externalities of Soil Stabilization in the Construction of Main Transportation Infrastructures. The Case of the High Speed Railway in North Italy: Economical and Environmental Benefits","authors":"A. Benedetto","doi":"10.2174/1874829501003010001","DOIUrl":null,"url":null,"abstract":"The technique of soil stabilization is usually adopted with the purpose of rendering plastic soils coherent to the standards and requirements of engineering projects. The environmental benefits of soil stabilization versus the use of traditional natural material from quarries are generally underestimated. The case study of one significant section of the Italian High Speed Railway is presented here. This section is a part of the line from Milan to Venice. The volume of material that is needed for the development of embankments amounts to about 3 million m 3 and 1.5 millions m 3 of aggregates are needed for concrete. At the same time the construction of foundations produces about 1 million m 3 of soil: 350,000 m 3 from foundations, 400,000 m 3 from diaphragms and drilled piles and 70,000 m 3 from helicoidal piles. The need to manage such a significant volume of soil suggests the need for the consideration of recycling the clay soil after lime stabilization. The technical compatibility is here verified. The total costs of all the actions derived from the Environmental Impact Assessment for environment protection is less than 8% of the savings produced by the stabilization of soil. It finally demonstrates that the question of non-renewable resource management, such as soil, is strategic also under an environmental protection perspective.","PeriodicalId":344616,"journal":{"name":"The Open Environmental Engineering Journal","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Open Environmental Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2174/1874829501003010001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The technique of soil stabilization is usually adopted with the purpose of rendering plastic soils coherent to the standards and requirements of engineering projects. The environmental benefits of soil stabilization versus the use of traditional natural material from quarries are generally underestimated. The case study of one significant section of the Italian High Speed Railway is presented here. This section is a part of the line from Milan to Venice. The volume of material that is needed for the development of embankments amounts to about 3 million m 3 and 1.5 millions m 3 of aggregates are needed for concrete. At the same time the construction of foundations produces about 1 million m 3 of soil: 350,000 m 3 from foundations, 400,000 m 3 from diaphragms and drilled piles and 70,000 m 3 from helicoidal piles. The need to manage such a significant volume of soil suggests the need for the consideration of recycling the clay soil after lime stabilization. The technical compatibility is here verified. The total costs of all the actions derived from the Environmental Impact Assessment for environment protection is less than 8% of the savings produced by the stabilization of soil. It finally demonstrates that the question of non-renewable resource management, such as soil, is strategic also under an environmental protection perspective.
主要交通基础设施建设中土壤稳定的外部性。意大利北部高速铁路的案例:经济和环境效益
为了使塑性土符合工程标准和要求,通常采用土壤稳定技术。与使用采石场的传统天然材料相比,土壤稳定的环境效益通常被低估了。本文介绍了意大利高速铁路的一个重要路段的案例研究。这一段是从米兰到威尼斯的线路的一部分。发展堤坝所需的材料量约为300万立方米,混凝土需要150万立方米的骨料。同时,基础建设产生约100万立方米的土壤:35万立方米来自基础,40万立方米来自横膈膜和钻孔桩,7万立方米来自螺旋桩。需要管理如此大量的土壤,这表明需要考虑石灰稳定后粘土的再循环。这里验证了技术兼容性。从环境影响评价中得出的所有环境保护行动的总成本不到土壤稳定所产生的节省的8%。最后论证了在环境保护的视角下,土壤等不可再生资源的管理问题具有战略意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信