Design of Stand-alone Solar-Wind-Hydro Based Hybrid Power System: Case of Rural Village in Malawi

S. Chisale, Z. Sari
{"title":"Design of Stand-alone Solar-Wind-Hydro Based Hybrid Power System: Case of Rural Village in Malawi","authors":"S. Chisale, Z. Sari","doi":"10.9734/jenrr/2019/v3i330098","DOIUrl":null,"url":null,"abstract":"Malawi has current electrification rate of less than 10% for a population of 18 million connected to the grid. The electricity generation company in Malawi (EGENCO) is greatly affected by low water levels making it difficult to satisfy the existing demand of electricity. This makes it difficult for Malawi to extend its National electricity grid. Thus, the aim of the study is to design stand-alone hybrid renewable energy system which is economically and technically feasible with focus on hydropower, wind, solar and battery bank within Dwangwa area. The study area is estimated to have 420 households, commercial and public service load with primary load demand of 5,556.31 kWh/day and peak load of 302.93 kW. River discharge data were collected from ministry of irrigation and water development while solar and wind data were collected from NASA. HOMER modeling tool was used to design a stand-alone system. From simulation results, the best design flow for Dwangwa river is 159 L/s at elevation of 100 metres and the best hybrid system combination was hydropower-wind-solar-battery and converter. The whole hybrid system initial capital cost was $2,662,638 while Net present cost (NPC) and levelized cost of energy (LCOE) were $3,597,197 and $0.134/kWh respectively. However, the cost of electricity in Malawi on the grid is K88.02/kWh ($0.11/kWh) which makes the system expensive. Therefore, the study has shown that the hybrid system is not economically viable. However, Government intervention can help to make the system monetarily acceptable and viable.","PeriodicalId":380297,"journal":{"name":"Advanced Aspects of Engineering Research Vol. 4","volume":"44 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Aspects of Engineering Research Vol. 4","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9734/jenrr/2019/v3i330098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Malawi has current electrification rate of less than 10% for a population of 18 million connected to the grid. The electricity generation company in Malawi (EGENCO) is greatly affected by low water levels making it difficult to satisfy the existing demand of electricity. This makes it difficult for Malawi to extend its National electricity grid. Thus, the aim of the study is to design stand-alone hybrid renewable energy system which is economically and technically feasible with focus on hydropower, wind, solar and battery bank within Dwangwa area. The study area is estimated to have 420 households, commercial and public service load with primary load demand of 5,556.31 kWh/day and peak load of 302.93 kW. River discharge data were collected from ministry of irrigation and water development while solar and wind data were collected from NASA. HOMER modeling tool was used to design a stand-alone system. From simulation results, the best design flow for Dwangwa river is 159 L/s at elevation of 100 metres and the best hybrid system combination was hydropower-wind-solar-battery and converter. The whole hybrid system initial capital cost was $2,662,638 while Net present cost (NPC) and levelized cost of energy (LCOE) were $3,597,197 and $0.134/kWh respectively. However, the cost of electricity in Malawi on the grid is K88.02/kWh ($0.11/kWh) which makes the system expensive. Therefore, the study has shown that the hybrid system is not economically viable. However, Government intervention can help to make the system monetarily acceptable and viable.
独立太阳能-风能-水力混合动力系统的设计:以马拉维农村为例
马拉维目前的电气化率不到10%,有1800万人口接入电网。马拉维的发电公司(EGENCO)受到低水位的严重影响,难以满足现有的电力需求。这使得马拉维很难扩展其国家电网。因此,本研究的目的是在Dwangwa地区设计经济上和技术上可行的独立的混合可再生能源系统,重点是水电、风能、太阳能和电池组。研究区估计有420户家庭、商业和公共服务负荷,一次负荷需求为5,556.31千瓦时/天,峰值负荷为302.93千瓦时。河流排放数据来自灌溉和水利发展部,太阳能和风能数据来自美国宇航局。采用HOMER建模工具对单机系统进行设计。仿真结果表明,旺洼河的最佳设计流量为159l /s,高程100 m,最佳混合系统组合为水能-风能-太阳能电池+变流器。整个混合动力系统的初始资本成本为2,662,638美元,净当前成本(NPC)和平准化能源成本(LCOE)分别为3,597,197美元和0.134美元/千瓦时。然而,马拉维电网的电力成本为88.02克朗/千瓦时(0.11美元/千瓦时),这使得该系统非常昂贵。因此,研究表明,混合系统在经济上是不可行的。但是,政府的干预可以帮助使该制度在货币上可以接受和可行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信