{"title":"Toward a Flexible Bidding Strategy with Preference Analysis","authors":"N. Zhou, Wesley M. Gifford, K. Ratakonda","doi":"10.1109/SCC.2013.20","DOIUrl":null,"url":null,"abstract":"Today, the majority of solution development is completed under a fixed-price contract. Due to the inherent uncertainty of executing a project with many unpredictable factors, the solution developer bears significant risk in terms of cost, delivery time and quality. Compared to a variable-price (time-and-materials) contract, a fixed-price contract shifts most of the development risk from clients to developers. Therefore, it is important for developers to understand the level of risk inherent in a project and take the proper steps to mitigate risks. From the analysis of custom application development projects using service-oriented architecture methods, we observe that extension of the project duration utilizing a smaller development team can help to reduce the project effort (working hours) and therefore reduce the development cost. We characterize the relationship between deterioration in team performance and the increase in project team size through multivariate regression. We also provide a method to adjust the results of standard project estimation methods to take into account client-side risks. We then propose simple client and developer utility functions to quantify these trade-offs. This serves as an initial framework to identify choices that can be made during the bidding process to reduce development risks.","PeriodicalId":370898,"journal":{"name":"2013 IEEE International Conference on Services Computing","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Services Computing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SCC.2013.20","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Today, the majority of solution development is completed under a fixed-price contract. Due to the inherent uncertainty of executing a project with many unpredictable factors, the solution developer bears significant risk in terms of cost, delivery time and quality. Compared to a variable-price (time-and-materials) contract, a fixed-price contract shifts most of the development risk from clients to developers. Therefore, it is important for developers to understand the level of risk inherent in a project and take the proper steps to mitigate risks. From the analysis of custom application development projects using service-oriented architecture methods, we observe that extension of the project duration utilizing a smaller development team can help to reduce the project effort (working hours) and therefore reduce the development cost. We characterize the relationship between deterioration in team performance and the increase in project team size through multivariate regression. We also provide a method to adjust the results of standard project estimation methods to take into account client-side risks. We then propose simple client and developer utility functions to quantify these trade-offs. This serves as an initial framework to identify choices that can be made during the bidding process to reduce development risks.
基于偏好分析的柔性竞价策略研究
今天,大多数解决方案开发是在固定价格合同下完成的。由于执行带有许多不可预测因素的项目的固有不确定性,解决方案开发人员在成本、交付时间和质量方面承担着重大风险。与可变价格(时间和材料)合同相比,固定价格合同将大部分开发风险从客户转移到开发人员身上。因此,对于开发人员来说,了解项目中固有的风险级别并采取适当的步骤来降低风险是很重要的。通过对使用面向服务的体系结构方法的定制应用程序开发项目的分析,我们观察到,利用较小的开发团队来延长项目持续时间可以帮助减少项目工作量(工作时间),从而降低开发成本。我们通过多元回归描述了团队绩效恶化与项目团队规模增加之间的关系。我们还提供了一种方法来调整标准项目评估方法的结果,以考虑客户端的风险。然后,我们提出简单的客户端和开发人员实用程序函数来量化这些权衡。这是一个初步框架,用于确定在招标过程中可以做出的选择,以减少开发风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信