Parallel machines scheduling with simultaneous considerations of position-dependent deterioration effects and maintenance activities

Suh-Jenq Yang
{"title":"Parallel machines scheduling with simultaneous considerations of position-dependent deterioration effects and maintenance activities","authors":"Suh-Jenq Yang","doi":"10.1080/10170669.2011.573006","DOIUrl":null,"url":null,"abstract":"This article considers identical parallel-machine scheduling problems with simultaneous considerations of position-dependent deterioration effects and maintenance activities. To counteract the deterioration effects on the machines, we assume that each machine must be maintained exactly once during the planning horizon and the maintenance can be scheduled immediately after completing the processing of any job. We further assume that, after the maintenance on a machine, the machine reverts to its initial condition and the deterioration effect starts anew. The objective is to find jointly the optimal maintenance positions and the optimal job sequences to minimize the total machine load. We provide polynomial time solutions for all the problems studied. Furthermore, we also show that the problem under study remains polynomially solvable when each machine is subject to multiple maintenance activities.","PeriodicalId":369256,"journal":{"name":"Journal of The Chinese Institute of Industrial Engineers","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"29","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The Chinese Institute of Industrial Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10170669.2011.573006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 29

Abstract

This article considers identical parallel-machine scheduling problems with simultaneous considerations of position-dependent deterioration effects and maintenance activities. To counteract the deterioration effects on the machines, we assume that each machine must be maintained exactly once during the planning horizon and the maintenance can be scheduled immediately after completing the processing of any job. We further assume that, after the maintenance on a machine, the machine reverts to its initial condition and the deterioration effect starts anew. The objective is to find jointly the optimal maintenance positions and the optimal job sequences to minimize the total machine load. We provide polynomial time solutions for all the problems studied. Furthermore, we also show that the problem under study remains polynomially solvable when each machine is subject to multiple maintenance activities.
同时考虑位置相关劣化效应和维修活动的并行机调度
本文研究了同时考虑位置相关劣化效应和维修活动的同一并行机调度问题。为了抵消机器的劣化影响,我们假设每台机器必须在计划范围内精确维护一次,并且可以在完成任何作业的处理后立即安排维护。我们进一步假设,对机器进行维护后,机器恢复到初始状态,退化效应重新开始。目标是共同找到最优维修位置和最优作业顺序,以最小化机器总负载。我们为所研究的所有问题提供多项式时间解。此外,我们还表明,当每台机器受到多次维护活动时,所研究的问题仍然是多项式可解的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信