{"title":"Analysis of Material and Temperature Rise Test of 10kV Drop-out Fuse","authors":"Liang Xingyu, Wang Feiming, Cheng Hui, Jin Yuanyuan, Li Bing, G. Baohong","doi":"10.1109/ICPRE51194.2020.9233209","DOIUrl":null,"url":null,"abstract":"In order to effectively control the quality of the 10kV drop fuse, the main reason for the operation of the fuse in the system is given, and the quality improvement method is proposed. The State Grid Corporation conducts the sampling test of the 10kV drop fuse. Through the material analysis and temperature rise test of the fuse, the material temperature of the contact surface of the main circuit conductor of the 10kV drop fuse is tested, and the test standard temperature rise limit is given. Combined with the temperature rise test results, the operating conditions and quality problems of the fuse equipment were analyzed. The test analyzes the root cause of the different operating currents of the fuses and the overheating at different locations. The temperature rise curve and the rising rate of the fuses at different positions are given. The results show that the fuse materials generally have different degrees of defects, the material testing failure rate is 88.9%, and the temperature rise test failure rate is 44.4%. The heat rise point of the fuse temperature rise test is mainly concentrated on the sliding position of the upper conductive piece and the upper contact, the screw connection position of the upper contact nut and the fusion tube, and the fastening position of the fuse and the lower conductor bolt. Therefore, strictly controlling the material quality of the 10kV drop fuse is of great significance for improving the stable operation of the 10kV drop fuse. The research results in this paper provide technical support for the material procurement of State Grid Corporation.","PeriodicalId":394287,"journal":{"name":"2020 5th International Conference on Power and Renewable Energy (ICPRE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 5th International Conference on Power and Renewable Energy (ICPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPRE51194.2020.9233209","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In order to effectively control the quality of the 10kV drop fuse, the main reason for the operation of the fuse in the system is given, and the quality improvement method is proposed. The State Grid Corporation conducts the sampling test of the 10kV drop fuse. Through the material analysis and temperature rise test of the fuse, the material temperature of the contact surface of the main circuit conductor of the 10kV drop fuse is tested, and the test standard temperature rise limit is given. Combined with the temperature rise test results, the operating conditions and quality problems of the fuse equipment were analyzed. The test analyzes the root cause of the different operating currents of the fuses and the overheating at different locations. The temperature rise curve and the rising rate of the fuses at different positions are given. The results show that the fuse materials generally have different degrees of defects, the material testing failure rate is 88.9%, and the temperature rise test failure rate is 44.4%. The heat rise point of the fuse temperature rise test is mainly concentrated on the sliding position of the upper conductive piece and the upper contact, the screw connection position of the upper contact nut and the fusion tube, and the fastening position of the fuse and the lower conductor bolt. Therefore, strictly controlling the material quality of the 10kV drop fuse is of great significance for improving the stable operation of the 10kV drop fuse. The research results in this paper provide technical support for the material procurement of State Grid Corporation.
10kV熔断器材料分析及温升试验
为了有效控制10kV跌落熔断器的质量,给出了熔断器在系统中运行的主要原因,并提出了质量改进方法。国家电网公司对10kV跌落熔断器进行抽样试验。通过保险丝的材料分析和温升试验,对10kV跌落保险丝主回路导体接触面的材料温度进行了测试,并给出了测试标准温升限值。结合温升试验结果,分析了熔断器设备的运行状况及存在的质量问题。试验分析了熔断器不同工作电流和不同位置过热的根本原因。给出了熔断器在不同位置的温升曲线和温升速率。结果表明,熔断器材料普遍存在不同程度的缺陷,材料试验故障率为88.9%,温升试验故障率为44.4%。熔断器温升试验的升温点主要集中在上导电片与上触头的滑动位置、上接触螺母与熔断管的螺钉连接位置、熔断器与下导体螺栓的紧固位置。因此,严格控制10kV跌落保险丝的材料质量,对于提高10kV跌落保险丝的稳定运行具有重要意义。本文的研究成果为国家电网公司物资采购提供了技术支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信