{"title":"Integrated resources planning for a centralized system","authors":"B. Meyer, L. Jamy","doi":"10.1109/PES.2004.1373056","DOIUrl":null,"url":null,"abstract":"EDF Group is implanted in several countries, especially in France, UK, Germany and Italia. Its system is essentially designed from a centralized viewpoint. But from 1990, different factors (such as liberalization of the market, technological progress, economic incentives, environmental constraints...) have led to a strong development of dispersed generation, which has to be taken into account in an integrated resources planning approach. Historically, energy is provided by centralized sources from the transmission grid to the distribution one. An important share of dispersed generation would modify the flows and make new constraints on the distribution grid, which was not designed to work so. This work quickly describes the structure and the actors of the French system. Then it presents the consequences of the growth of dispersed generation, regulatory issues, possible scenarios of evolution (percentage of dispersed generation in the whole system capacity), and the ongoing research projects to deal with this new question.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

EDF Group is implanted in several countries, especially in France, UK, Germany and Italia. Its system is essentially designed from a centralized viewpoint. But from 1990, different factors (such as liberalization of the market, technological progress, economic incentives, environmental constraints...) have led to a strong development of dispersed generation, which has to be taken into account in an integrated resources planning approach. Historically, energy is provided by centralized sources from the transmission grid to the distribution one. An important share of dispersed generation would modify the flows and make new constraints on the distribution grid, which was not designed to work so. This work quickly describes the structure and the actors of the French system. Then it presents the consequences of the growth of dispersed generation, regulatory issues, possible scenarios of evolution (percentage of dispersed generation in the whole system capacity), and the ongoing research projects to deal with this new question.
集中系统的综合资源规划
法国电力集团在几个国家,特别是法国,英国,德国和意大利。它的系统本质上是从一个集中的角度设计的。但是从1990年开始,不同的因素(如市场自由化、技术进步、经济激励、环境限制……)导致分散发电的强劲发展,在综合资源规划办法中必须考虑到这一点。从历史上看,能源是从输电网到配电网的集中来源提供的。分散发电的重要份额将改变潮流,并对配电网产生新的约束,而配电网的设计并非如此。这本书很快地描述了法国体系的结构和参与者。然后介绍了分散发电增长的后果、监管问题、可能的进化情景(分散发电在整个系统容量中的百分比),以及正在进行的研究项目来处理这个新问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信