Implementation and tuning of the automatic generation control in the Energy National Control Center of Ecuador - CENACE

A. Narváez
{"title":"Implementation and tuning of the automatic generation control in the Energy National Control Center of Ecuador - CENACE","authors":"A. Narváez","doi":"10.1109/ICIECA.2005.1644390","DOIUrl":null,"url":null,"abstract":"The automatic generation control - AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process of tuning and testing of the remote control devices for generation units and the AGC program installed in the electric market administrator","PeriodicalId":394689,"journal":{"name":"2005 International Conference on Industrial Electronics and Control Applications","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 International Conference on Industrial Electronics and Control Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIECA.2005.1644390","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The automatic generation control - AGC has as the main objective keep the system frequency and the net interchange in the tie lines near to their scheduled values through generation set points in the units conditioned to this purpose. Consequently, the AGC implementation requires a careful process of tuning and testing of the remote control devices for generation units and the AGC program installed in the electric market administrator
厄瓜多尔国家能源控制中心CENACE自动发电控制的实施与调整
自动发电控制(AGC)的主要目标是通过满足此目的的机组中的发电设定点,使并网线路上的系统频率和网交换接近其计划值。因此,AGC的实施需要对发电机组的远程控制设备和安装在电力市场管理器中的AGC程序进行仔细的调试和测试
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信