An Exploration of BIM and Lean Interaction in Optimizing Demolition Projects

A. Elmaraghy, H. Voordijk, M. Marzouk
{"title":"An Exploration of BIM and Lean Interaction in Optimizing Demolition Projects","authors":"A. Elmaraghy, H. Voordijk, M. Marzouk","doi":"10.24928/2018/0474","DOIUrl":null,"url":null,"abstract":"Construction and demolition wastes have an adverse environmental impact. The demolition wastes are resulted from the linear economic behaviour that the Construction industry is currently adopting. IT-enabled processes like BIM have been used to eliminate wastes in Construction Projects. The alignment of these processes with Lean Construction principles was seen to reap high benefits. This research investigates the possibility of extending BIM functionalities to support deconstruction processes in alignment with Lean Principles. Based on the existing interaction matrix between BIM functionalities and Lean Principles and its subsequent extensions, the synergies between BIM and Lean are explored from a deconstruction perspective. The evidence of using BIM capabilities in deconstruction projects is mainly interpreted from research in addition to the current initiatives in the demolition and renovation projects in The Netherlands. The main aim is to integrate discrete efforts in industry and academia towards leveraging the recovery rate of salvaged elements. The evidence is then validated against Lean principles and the results reveal a major conformity between BIM and Lean. This exploratory research may contribute to the adoption of a structured framework in deconstruction projects that exploits BIM and Lean capabilities towards achieving a circular economy.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0474","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

Abstract

Construction and demolition wastes have an adverse environmental impact. The demolition wastes are resulted from the linear economic behaviour that the Construction industry is currently adopting. IT-enabled processes like BIM have been used to eliminate wastes in Construction Projects. The alignment of these processes with Lean Construction principles was seen to reap high benefits. This research investigates the possibility of extending BIM functionalities to support deconstruction processes in alignment with Lean Principles. Based on the existing interaction matrix between BIM functionalities and Lean Principles and its subsequent extensions, the synergies between BIM and Lean are explored from a deconstruction perspective. The evidence of using BIM capabilities in deconstruction projects is mainly interpreted from research in addition to the current initiatives in the demolition and renovation projects in The Netherlands. The main aim is to integrate discrete efforts in industry and academia towards leveraging the recovery rate of salvaged elements. The evidence is then validated against Lean principles and the results reveal a major conformity between BIM and Lean. This exploratory research may contribute to the adoption of a structured framework in deconstruction projects that exploits BIM and Lean capabilities towards achieving a circular economy.
BIM与精益交互在拆迁项目优化中的探索
建筑和拆除废物对环境有不利影响。建筑行业目前采用的线性经济行为导致了拆迁废物的产生。像BIM这样的it支持流程已被用于消除建筑项目中的浪费。将这些过程与精益构建原则结合起来,可以获得很高的收益。本研究探讨了扩展BIM功能以支持与精益原则一致的解构过程的可能性。基于BIM功能与精益原则之间的现有交互矩阵及其后续扩展,从解构的角度探索BIM与精益之间的协同作用。在解构项目中使用BIM能力的证据主要来自研究以及荷兰目前拆除和翻新项目中的举措。其主要目的是整合工业界和学术界的离散努力,以利用回收元件的回收率。然后根据精益原则验证证据,结果显示BIM和精益之间的主要一致性。这项探索性研究可能有助于在解构项目中采用结构化框架,利用BIM和精益能力实现循环经济。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信